Filtered generated 7 hits.
-
2015:51 Technical Note, Initial State of Spent Nuclear Fuel
Sophie Grape, Carl Hellesen, Henrik Sjöstrand, Mattias Lantz, Staffan Jacobsson Svärd SSM English...
Content type: Publications -
2015:40 Technical Note, Assessment of flow-related transport parameters used in the SR-Site safety case
Joel E. Geier SSM English...
Content type: Publications -
2015:41 Technical Note, Hydrogeological aspects of future human actions for a repository at Forsmark
Joel E. Geier SSM English...
Content type: Publications -
2014:48 Technical Note, Independent assessment of groundwater sulphide content in the long-te
Groundwater sulphide content is a key factor in the determination of canister lifetimes because of its role in corrosion of copper. SKB has based the canister lifetime analysis on a distribution of measured sulphide concentrations which are assumed to apply throughout the long-term analysis period. The distribution is based on expert judgement in the selection of samples that are regarded as...
Content type: Publications -
2012:56 Technical Note, Biosphere Dose Assessment: Review of Dose Consequence of Radionuclides in the Uranium-238 Series Decay Chain
As part of the Swedish Radiation Safety Authority (SSM) initial phase review of the Swedish Nuclear Fuel and Waste Management Company (SKB) SR-Site safety assessment for a spent nuclear fuel repository in Sweden, this technical note documents Center for Nuclear Waste Regulatory Analyses (CNWRAÒ) review of potential effects on SKB dose calculations from radioactive elements associated with...
Content type: Publications -
2012:42 Technical Note, Initial review of physical properties and processes of the buffer and backfill – Installation and initial state
The technical note briefly summarises the proposed designs and functions of the buffer and backfill, and examines SKB’s progress in manufacturing, installing and testing its proposed solutions. In brief, the review suggests that there are some procedural and practical engineering aspects (e.g., quality assurance procedures, backfilling rates) and several physical processes to do with the...
Content type: Publications -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Content type: Publications
Go to page:
-
1 (current page)