Safety at nuclear power plants

Select year

Select publisher

Filtered generated 9 hits.

Sort on:

Relevance Date
  • 2009:38 Research and Development Program in Reactor Diagnostics and Monitoring with Neutron Noise Methods, Stages 14 and 15

    This report constitutes Stages 14 and 15 of a long-term research and development program concerning the development of diagnostics and monitoring methods for nuclear reactors. Stage 14 was a full one-year project, whereas Stage 15 consisted of a half-year project. Results up to Stage 13 were reported in SKI reports, as listed below and in the Summary. The results have also been published in...

    Content type: Publications
  • 2009:27 Analysis Strategy for Fracture Assessment of Defects in Ductile Materials

    SSM has supported research for investigating the role of secondary stresses when fracture assessments are performed for cracked structures made of ductile materials. There are evidences that indicate that some secondary stresses, such as weld residual stresses, are not as important as primary stresses for estimating the safety margin against rupture (measured by the J-integral) for the type...

    Content type: Publications
  • 2009:17 Effect of Welding Residual Stresses on Crack Opening Displacement and Crack-Tip Parameters

    Weld residual stresses have a large influence on the behavior of cracks growing under normal operation loads and on the leakage-flow from a through-wall crack. Accurate prediction of these events is important in order to arrive at proper conclusions when assessing detected flaws, for inspection planning and for assessment of leak-before-break margins. The fracture mechanical treatment of weld...

    Content type: Publications
  • 2009:16 Influence of Hardening Model on Weld Residual Stress Distribution

    Weld residual stresses have a large influence on the behavior of cracks growing under normal operation loads and on the leakage-flow from a through-wall crack. Accurate prediction of these events is important in order to arrive at proper conclusions when assessing detected flaws, for inspection planning and for assessment of leak-before-break margins. Therefore, it is very important to have...

    Content type: Publications
  • 2009:15 Improvement and Validation of Weld Residual Stress Modelling Procedure

    Weld residual stresses have a large influence on the behavior of cracks growing under normal operation loads and on the leakage-flow from a through-wall crack. Accurate prediction of these events is important in order to arrive at proper conclusions when assessing detected flaws, for inspection planning and for assessment of leak-before-break margins. Therefore, it is very important to have...

    Content type: Publications
  • 2009:12 Evaluating safety-critical organizations – emphasis on the nuclear industry

    The regulator identified a few years ago a need for a better understanding of and a deeper knowledge on methods for evaluating safety critical organisations. There is a need for solid assessment methods in the process of management of organisational changes as well as in continuously performed assessment of organisations such as nuclear power plants. A considerable body of literature exists...

    Content type: Publications
  • 2009:13e 2009 assessment of radiation safety in the Swedish nuclear power plants

    This report has been prepared by order of the Swedish government in accordance with the “Governmental directive for the financial year 2009 regarding the Swedish Radiation Safety Authority”. The Swedish Radiation Safety Authority has through its supervision ensured a comprehensive basis for this overall assessment of radiation safety. The overall conclusion is that the radiation safety,...

    Content type: Publications
  • 2009:07 Dependency Analysis Guidance Nordic/German Working Group on Common Cause Failure analysis

    The Regulatory Code SSMFS 2008:1 of Swedish Radiation Safety Authority (SSM) includes requirements regarding the performance of probabilistic safety assessments (PSA), as well as PSA activities in general. Therefore, the follow-up of these activities is part of the inspection tasks of SSM. According to the SSMFS 2008:1, the safety analyses shall be based on a systematic identification and...

    Content type: Publications
  • 2009:05 Survey on requirements for independent reviews and inspections of electrical and I&C equipment

    This survey is a first step to support the work to develop the Swedish regulations in the area of independent review and inspection in the process supporting implementation of electrical equipment in nuclear power plants. The report consists of a summary of different regulations in the area and also an analysis of the differences between the electrical and mechanical field especially in the...

    Content type: Publications