Waste – shipments – physical protection

Filtered generated 42 hits.

Sort on:

Relevance Date
  • 2012:11 Issues in the corrosion of copper in a Swedish high level nuclear waste repository

    The objective with this research project was to increase knowledge in the area of copper corrosion in the planned repository environment and obtain information on how copper corrosion evolves during the assessment period of 100 000 years.  The equilibrium chemical composition of groundwater close to the canister as a function of temperature has been calculated by use of a thermodynamics...

    Content type: Publications
  • 2012:08 Deterministic Assessment of Future Costs for Dismantling (FA)

    In this study a model for advanced deterministic cost calculation has been used to find a parametric value on the cost for dismantling of the FA-facility. The study gives good description of good practise to collect, test and utilise input data in a systematic way in order to make prudent cost estimates for any particular nuclear installation The Swedish Law stipulates that future expenses...

    Content type: Publications