Publications

Filtered generated 369 hits.

Sort on:

Relevance Date
  • 2007:31e Safety and Radiation Protection at Swedish Nuclear Power Plants 2006

    Safety related problems in the electric systems of the Forsmark 1 reactor were the dominant event in Swedish nuclear power plants in 2006. The incident has had a significant impact on our attitude towards the reliability of how safety systems function both in Sweden and abroad. In connection with SKI’s review of the incident it was found that the company’s management system was not...

    Content type: Publications
  • 2007:30 Modelling the Interaction of Low pH Cements and Bentonite

    Concrete and cement are used in constructions as well as in conditioning of waste inrepositories for radioactive waste. It is well known that in the hyperalkaline conditions (pH > 12) of standard cement pore fluids, there is potential for deleterious effects upon the host rock and other EBS materials, notably bentonite, in geological repositories. Low pH cements are beginning to be considered...

    Content type: Publications
  • 2007:21 On tentative decommissioning cost analysis with specific authentic cost calculations with the application of the Omega code on a case linked to the Intermediate storage facility for spent fuel in Sweden

    Marek Vasko, Vladimir Daniska, Frantisek Ondra, Peter Bezak, Kristina Kristofova, Peter Tatransky, Matej Zachar, Staffan Lindskog SKI English...

    Content type: Publications
  • 2007:09 DECOVALEX-THMC - Task C

    This report describes the results of Task C1 of the international DECOVALEX– THMC project devoted to Excavation Damage Zone (EDZ) in argillaceous rock at the Tournemire site in France. Task C of the project is aimed to understand the physical phenomena induced by excavation in the argillaceous rock. The task is to develop adequate numerical models for interpretation of observed damaged zones...

    Content type: Publications
  • 2007:07 DECOVALEX-THMC Project - Task A

    This report presents the definition of the first phase, Task A-1, of the Task A of the international DECOVALEX project. The task is a working example of how interaction between THMC modelling and SA analysis could be performed. Starting with the technical definition of the Task A, the report presents the results of preliminary THM calculations with a purpose of an initial appreciation of the...

    Content type: Publications
  • 2007:10 DECOVALEX-THMC - Task D

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The name DECOVALEX stands for DEvelopment of COupled models and their VALidation against Experiments. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on...

    Content type: Publications
  • 2007:03 Variability and Uncertainties of Key Hydrochemical Parameters for SKB Sites

    An important part of the site investigations conducted by the Swedish Nuclear Fuel and Waste Management Company (SKB) is the characterisation of groundwater chemical conditions in the deep bedrock environment where a final repository for spent nuclear fuel is planned to be located. This work is currently in its final stages at the two candidate sites, Forsmark and Laxemar, and should be...

    Content type: Publications
  • 2007:02 Stakeholder involvement in Swedish nuclear waste management

    This report have attempted to show the development of stakeholder involvement in the siting of a final repository for Sweden’s spent nuclear fuel as resembling something other than a straightforward linear process of improvement and refinement. Stakeholder involvement has developed, over the past 15 years or so, in something more like a patchwork of different shapes and forms. Some of the...

    Content type: Publications
  • 2007:22 Safety Management An Introduction to a Frame of Reference Exemplified with Case Studies from Non-Nuclear Contexts

    A systems perspective has been applied on safety management that will be the foundation for the frame of reference the authors intend to build during the three-year long project. The case studies are presented and form illustrations of both high quality safety management and weaknesses of the safety management and take a look at information feedback about the risks of the systems. An...

    Content type: Publications
  • 2007:05 Development of an Input Model to MELCOR 1.8.5 for Oskarshamn 3 BWR

    200 Lars Nilsson SKI English...

    Content type: Publications