Search

Filtered generated 280 hits.

Sort on:

Relevance Date
  • 2010:42 Using the EPRI Risk-Informed ISI Methodology on Piping Systems in Forsmark 3

    In the SSM regulation SSMFS 2008:13, it is stated that the selection of locations for inspection of mechanical components shall be based upon the risk for core damage or the risk of release of radioactive substances. Both qualitative and quantitative measures of the relative risk are allowed to be used. So far only the PWRs in Sweden are using a quantitative procedure to evaluate the risk...

    Content type: Publications
  • 2011:29 Research and Development Program in Reactor Diagnostics and Monitoring with Neutron Noise Methods, Stage 17

    This report constitutes Stage 17 of a long-term research and development program concerning the development of diagnostics and monitoring methods for nuclear reactors. Results up to Stage 16 were reported in SKI and SSM reports, as listed below and in the Summary. The results have also been published in international journals and have been included in both licentiate- and doctor’s degrees.

    Content type: Publications
  • 2011:17 Structural Health Monitoring of Piping in Nuclear Power Plants – A Review of Efficiency of Existing Methods

    SSM needs to acquire knowledge about new applied Non-Destructive Engineering (NDE) techniques and their efficiency. One area that is discussed more frequently is Structural Health Monitoring (SHM). SSM needs to investigate the international experiences of SHM from the nuclear industry. SSM also wants to have more information about the capabilities and the limitations of NDE methods The first...

    Content type: Publications
  • 2011:33 Mathematical modelling of ultrasonic testing of components with defects close to a non-planar surface

    The report describes work that has been performed in order to model ultrasonic testing of components that contain a defect close to a non-planar surface. The studies have been performed in both 2D and 3D, and in 2D in both the anti-plane (SH) and the in-plane (P-SV). The results show that the presence of a non-planar back wall can reduce the detectability of defects close to the surface. The...

    Content type: Publications
  • 2009:27 Analysis Strategy for Fracture Assessment of Defects in Ductile Materials

    SSM has supported research for investigating the role of secondary stresses when fracture assessments are performed for cracked structures made of ductile materials. There are evidences that indicate that some secondary stresses, such as weld residual stresses, are not as important as primary stresses for estimating the safety margin against rupture (measured by the J-integral) for the type...

    Content type: Publications
  • 2010:46 Development of the PRO-LOCA Probabilistic Fracture Mechanics Code, MERIT Final Report

    The MERIT project has been an internationally financed program with the main purpose of developing probabilistic models for piping failure of nuclear components and to include these models in a probabilistic code named PRO-LOCA. The principal objective of the project has been to develop probabilistic models for piping failure of nuclear components and to include these models in a...

    Content type: Publications
  • 2007:15 Evaluation of the FRAPTRAN -1.3 Computer Cod

    The FRAPTRAN-1.3 computer code has been evaluated regarding its applicability, modelling capability, user friendliness, source code structure and supporting experimental database. The code is intended for thermo-mechanical analyses of light water reactor nuclear fuel rods under reactor power and coolant transients, such as overpower transients, reactivity initiated accidents (RIA),...

    Content type: Publications
  • 2007:06 Probabilistic Safety Goals - Phase 1 -Status and Experiences in Sweden and Finland

    Based on a series of interviews and on literature reviews as well as on a limited interna- tional over-view, the project has described the history and current status of safety goals in Sweden and Finland. A number of issues were discussed more in detail, including the status of the safety goals in view of the fact that they are often exceeded, strategies for handling violations of safety...

    Content type: Publications
  • 2007:39 Influence of Crack Morphology on Leak Before Break Margins

    The SKI regulation SKIFS 2004:2 allows for the use of Leak Before Break (LBB) as one way to provide assurance that adequate protection exists against the local dynamic consequences of a pipe break. The way to demonstrate that LBB prevails relies on a deterministic procedure for which a leakage crack is postulated in certain sections of the pipe based on the leak detection capability of the...

    Content type: Publications
  • 2007:04 Link Between RI-ISI and Inspection Qualification: Relationship between Defect Detection Rate and Margin of Detection

    A relationship has been established between defect detection ratio and margin of detection based on blind trails. The results are based on a rather small amount of data produced by personnel from one inspection laboratory but give us indications of how signal to noise ratio is possible to relate to the probability of detection (POD) used in RI-ISI models. The relationship need to be developed...

    Content type: Publications