Filtered generated 123 hits.
-
2014:07 Technical Note, Review of the geological mapping and geophysical measurement techniques for the determination of critical properties around deposition holes -Main Review Phase
This Technical Note reports the findings of a detailed evaluation of the geological and geophysical methods proposed by SKB with respect to their ability, resolution, performance, reliability and robustness to measure the geomechanical parameters critical for determining deposition hole acceptability during repository operation. Addressed are specific questions focusing on the detection of...
Content type: Publications -
2014:05 Technical Note, Assessment of flows to deposition holes – Main Review Phase
SKB’s conceptual model for flow through the fractured rock at Forsmark is based on a division between highly fractured deformation zones (described in terms of deterministic geometry), and the more sparsely fractured rock (described in terms of statistical geometry). The model for the highly fractured deformation zones includes several assumptions that are not strongly supported by data,...
Content type: Publications -
2014:17 Technical Note, Assessment of radiological effects on non-human biota –Main Review Phase
This report presents a review of SKBs assessment of the long-term radiological effects on plants and animals of a deep geological repository as described in SKB report TR-10-08. The SKB report is one of a number contributing to the overall safety assessment, referred to as SR-Site, for the repository. The conclusion of the SKB report was that the ‘study gives no reason to assume that any of...
Content type: Publications -
2014:23 Technical Note, Workshop on Rock Mechanics Issues and their Implications for Groundwater Flow – Main Review Phase
This report describes the outcome of the workshop organized by SSM on Rock Mechanics and Hydrogeology that was held in Stockholm on the 30/9 and 1/10, 2013. The report summarizes the issues discussed and extracts the essential viewpoints that have been expressed. It should not be considered as a comprehensive record of all the discussions at the workshop and individual statements made by...
Content type: Publications -
2014:22 Technical Note, Workshop on seismic hazard at Forsmark
This report describes the outcome of the workshop organized by SSM on seismic hazard at Forsmark that was held in Stockholm on the 4 and 5 of June, 2013. The report summarizes the issues discussed and extracts the essential viewpoints that have been expressed. It should not be considered as a comprehensive record of all the discussions at the workshop and individual statements made by...
Content type: Publications -
2013:33 Technical Note, Seismology – Frequencies and mechanisms. -Initial review phase
The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...
Content type: Publications -
2012:65 Technical Note, Review of the Nuclear Criticality Safety of SKB’s Licensing Application for a Spent Nuclear Fuel Repository in Sweden
The Swedish Nuclear Fuel and Waste Management Company in 2011 applied to the Swedish government for approval of a proposed solution for disposal of used fuel from Swedish nuclear power reactors and some relatively minor quantities of other fissile material. This Technical Note contains results of a recent nuclear criticality safety review of the overall prospects of the application being able...
Content type: Publications -
2012:61 Geochemical Constraints on Buffer Pore Water Evolution and Implications for Erosion
Mineralogical data from the Forsmark Site show that smectite and calcite occur at all depths in Forsmark fractures, with no evidence for removal/dissolution by previous glacial episodes. This natural analogue information implies that these minerals may not have been eroded/dissolved during previous glacial episodes. Available thermodynamic data suggest that repository-depth Forsmark...
Content type: Publications -
2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Content type: Publications -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
This technical note is part of a set of reviews for Swedish Radiation Safety Authority (SSM) by external experts to assist with the Initial Review Phase. The overall goal of the Initial Review Phase is for SSM to achieve a broad coverage of the information provided in SR-Site and its supporting references and in particular to identify where complementary information or clarifications need to...
Content type: Publications