Search

Filtered generated 42 hits.

Sort on:

Relevance Date
  • 2012:36 Technical Note, Documentation and Traceability of Data in SKB’s Safety Assessment SR-Site: Initial Review Phase

    On 16th March 2011SKB applied for a licence to construct and operate a spent nuclear fuel encapsulation facility in Oskarshamn Municipality and a final repository for the encapsulated fuel at Forsmark in Östhammar Municipality. SKB’s SR-Site safety assessment for the spent fuel repository is currently being reviewed by the Swedish Radiation Safety Authority, SSM, and its external experts...

    Content type: Publications
  • 2012:34 Technical Note, Review of FEP Handling in the SR-Site Safety Assessment: Initial Review Phase

    On 16th March 2011 the Swedish Nuclear Fuel and Waste Management Company, SKB, submitted applications for licences to construct a spent nuclear fuel encapsulation facility in Oskarshamn and a repository for final disposal of the encapsulated fuel in Forsmark. SKB’s applications are currently being reviewed by the Swedish Radiation Safety Authority, SSM, and the Land and Environmental Court in...

    Content type: Publications
  • 2012:37 Technical Note, Selective review of the hydrogeological aspects of SR-Site

    This review of the hydrogeology is selective. It focuses on the measurement, interpretation and modelling of the potential repository host rock, that is the rock domain FFM01<-400m. It accepts as reasonably accurate the measurement and representation of the more transmissive parts of the hydrogeological system, particularly the near-surface 150m in the form presented by SKB. SKB have decided...

    Content type: Publications
  • 2012:03 The IAEA Integrated Regulatory Review Service Mission to Sweden in February 2012

    The Swedish Government decided on January 22, 2009 to mandate the Swedish Radiation Safety Authority, SSM, to apply for an international review of the Author-ity and its areas of supervision, an ‘IRRS’ (Integrated Regulatory Review Service) carried out by the International Atomic Energy Agency (IAEA). On February 25, 2009, SSM made a formal request to the IAEA for an IRRS in Sweden. The time...

    Content type: Publications
  • 2012:08 Deterministic Assessment of Future Costs for Dismantling (FA)

    In this study a model for advanced deterministic cost calculation has been used to find a parametric value on the cost for dismantling of the FA-facility. The study gives good description of good practise to collect, test and utilise input data in a systematic way in order to make prudent cost estimates for any particular nuclear installation The Swedish Law stipulates that future expenses...

    Content type: Publications
  • 2012:38 Technical Note, Radiological effects on non-human biota - initial review

    The focus of this review was SKB’s assessment of radiological effects on non-human biota in SR-Site according to present regulations and guidance from SSM and it was conducted by Karolina Stark at the Department of Systems Ecology, Stockholm University. In short, the results from this review show that the completeness of the safety assessment can be questioned regarding considered...

    Content type: Publications
  • 2012:15 Technical Note, A review of the mechanical integrity of the canister

    An introductory review of SR-Site has been conducted with respect to the mechanical integrity of the canister. The review is focused on the copper canister and the nodular cast iron insert. Review results show that a number of loads and loading scenarios for the copper canister has not been analysed by SKB. The importance of sufficient creep ductility of the copper material and sufficient...

    Content type: Publications
  • 2012:30 Technical Note, Initial review of physical properties and processes of the buffer and backfill. THM and other physical processes

    The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...

    Content type: Publications
  • 2012:25 Workshop on Seismology

    This report summarizes the issues discussed at the workshop and extracts the essential viewpoints that have been expressed. The report is not to consider as a comprehensive record of all the discussions at the workshop and individual statements made by workshop participants should be regarded as opinions rather than proven facts. This report includes, apart from the workshop synthesis, the...

    Content type: Publications
  • 2012:28 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes

    This report consists of a Technical Note in SSM’s initial review phase of SKB’s safety analysis SR-Site. The aim of the initial review of issues concerning geochemical processes in buffer and backfill in a final repository is to make a broad illustration and review of SR-Site together with its subordinate references, as well as to identify potential needs for complementary information or...

    Content type: Publications