Search

Filtered generated 375 hits.

Sort on:

Relevance Date
  • 2007:26 Safety Culture Enhancement Project Final Report

    At the International Conference on Safety Culture in Nuclear Installations, organized by IAEA in 2002, one concluding remark was that the regulators should encourage a sincere interest in safety culture among licensees. In line with this SKI wanted to explore a proactive path to encourage the licensees in their safety culture work. SKI also had the ambition to gain more information on the MTO...

    Content type: Publications
  • 2007:31e Safety and Radiation Protection at Swedish Nuclear Power Plants 2006

    Safety related problems in the electric systems of the Forsmark 1 reactor were the dominant event in Swedish nuclear power plants in 2006. The incident has had a significant impact on our attitude towards the reliability of how safety systems function both in Sweden and abroad. In connection with SKI’s review of the incident it was found that the company’s management system was not...

    Content type: Publications
  • 2007:06 Probabilistic Safety Goals - Phase 1 -Status and Experiences in Sweden and Finland

    Based on a series of interviews and on literature reviews as well as on a limited interna- tional over-view, the project has described the history and current status of safety goals in Sweden and Finland. A number of issues were discussed more in detail, including the status of the safety goals in view of the fact that they are often exceeded, strategies for handling violations of safety...

    Content type: Publications
  • 2007:39 Influence of Crack Morphology on Leak Before Break Margins

    The SKI regulation SKIFS 2004:2 allows for the use of Leak Before Break (LBB) as one way to provide assurance that adequate protection exists against the local dynamic consequences of a pipe break. The way to demonstrate that LBB prevails relies on a deterministic procedure for which a leakage crack is postulated in certain sections of the pipe based on the leak detection capability of the...

    Content type: Publications
  • 2007:04 Link Between RI-ISI and Inspection Qualification: Relationship between Defect Detection Rate and Margin of Detection

    A relationship has been established between defect detection ratio and margin of detection based on blind trails. The results are based on a rather small amount of data produced by personnel from one inspection laboratory but give us indications of how signal to noise ratio is possible to relate to the probability of detection (POD) used in RI-ISI models. The relationship need to be developed...

    Content type: Publications
  • 2007:14 Review of experimental data for modelling LWR fuel cladding behaviour under loss of coolant accident conditions

    This project has contributed to the research goal of giving a basis for SKIs supervision by means of evaluating experimental data and modelling the nuclear fuel cladding during a design base accident. The project has also contributed to the research goal to develop the competence about licensing of fuel at high burnup, which is an important safety issue. The results are useful as such, but...

    Content type: Publications
  • SKI Report 2008:01 Reliability Data for piping Components in Nordic Nuclear Poer Plants "R-Book" Project Phase 1

    SKI Report 2008:01 - “Reliability Data for Piping Components in Nordic Nuclear Power Plants - R-Book Project Phase I” – is a planning document for a new R&D project to develop a piping component reliability parameter handbook for use in probabilistic safety assessment (PSA) and related activities. Included in this handbook will be pipe leak failure rates and rupture frequencies that are...

    Content type: Publications
  • 2009:15 Improvement and Validation of Weld Residual Stress Modelling Procedure

    Weld residual stresses have a large influence on the behavior of cracks growing under normal operation loads and on the leakage-flow from a through-wall crack. Accurate prediction of these events is important in order to arrive at proper conclusions when assessing detected flaws, for inspection planning and for assessment of leak-before-break margins. Therefore, it is very important to have...

    Content type: Publications
  • 2008:38 Methodology for description and evaluation of cost profiles and cost structure during transitions period

    A demanding task for our generation is to assure the appropriate financial resources are invested in the Swedish Nuclear Waste Fund. This will enable future generations to execute the decommissioning and dismantling of nuclear power reactors and other nuclear facilities in a prudent manner. The main aim is to fulfil the demands of environmental and health codes in a pan-European context...

    Content type: Publications
  • 2009:13e 2009 assessment of radiation safety in the Swedish nuclear power plants

    This report has been prepared by order of the Swedish government in accordance with the “Governmental directive for the financial year 2009 regarding the Swedish Radiation Safety Authority”. The Swedish Radiation Safety Authority has through its supervision ensured a comprehensive basis for this overall assessment of radiation safety. The overall conclusion is that the radiation safety,...

    Content type: Publications