Search

Filtered generated 377 hits.

Sort on:

Relevance Date
  • 2007:02 Stakeholder involvement in Swedish nuclear waste management

    This report have attempted to show the development of stakeholder involvement in the siting of a final repository for Sweden’s spent nuclear fuel as resembling something other than a straightforward linear process of improvement and refinement. Stakeholder involvement has developed, over the past 15 years or so, in something more like a patchwork of different shapes and forms. Some of the...

    Content type: Publications
  • 2007:32 Low pH Cements

    Concrete and cement are used in constructions as well as in conditioning of waste in repositories for radioactive waste. The development of low pH cements for use in geological repositories for radioactive waste stem from concerns over the potential for deleterious effects upon the host rock and other EBS materials (notably bentonite) under the hyperalkaline conditions (pH > 12) of cement...

    Content type: Publications
  • 2007:29 Intercomparison of Cement Solid-Solution Models

    Many concepts for the geological storage of radioactive waste incorporate cement based materials, which act to provide a chemical barrier, impede groundwater flow or provide structural integrity of the underground structures. Thus, it is important to understand the long-term behaviour of these materials when modelling scenarios for the potential release and migration of radionuclides. In the...

    Content type: Publications
  • 2007:21 On tentative decommissioning cost analysis with specific authentic cost calculations with the application of the Omega code on a case linked to the Intermediate storage facility for spent fuel in Sweden

    Marek Vasko, Vladimir Daniska, Frantisek Ondra, Peter Bezak, Kristina Kristofova, Peter Tatransky, Matej Zachar, Staffan Lindskog SKI English...

    Content type: Publications
  • 2017:27e Review of Swedish emergency planning zones and distances

    ESS research facility Summary On 22 October 2015, the Government of Sweden commissioned the Swedish Radiation Safety Authority (SSM) to, in consultation with the Swedish Civil Contingencies Agency (MSB), relevant county administrative boards and the other authorities and stakeholders concerned, perform a review of emergency planning zones and emergency planning distances applying to...

    Content type: Publications
  • 2016:23 Technical Note, Modelling of the thermal evolution of the KBS-3 repository at Forsmark and associated induced seismic activity

    Main Review Phase Introduction The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of the KBS-3 repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain...

    Content type: Publications
  • 2011:22 Infiltration of dilute groundwaters and resulting groundwater compositions at repository depth

    The planned Swedish concept for final disposal of spent nuclear fuel includes copper canisters placed in deposition holes at about 500 m depth in granitic bedrock. The copper canisters will be surrounded by bentonite buffer with the objective of inhibiting groundwater flow adjacent to the canister. It has been discovered that dilute glacial melt-water may induce erosion of the buffer material.

    Content type: Publications
  • 2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper

    The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...

    Content type: Publications
  • 2012:17 Technical Note, Corrosion of copper canister

    It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...

    Content type: Publications
  • 2012:24 Technical Note, Initial Review of SR-Site Main Report

    The Swedish Radiation Safety Authority (SSM) is reviewing a license application, which has been submitted by Svensk Kärnbränslehantering AB (SKB), for a repository for the final disposal of spent nuclear fuel. SKB’s Application includes an assessment of the long-term safety of the proposed repository. The assessment is known as SR-Site. This technical note records the findings from a...

    Content type: Publications