2008:05 International Expert Review of SR-Can: Safety Assessment Methodology - External review contribution in support of SSI's and SKI's review of SR-Can
In 2006, SKB published a safety assessment (SR-Can) as part of its work to support a licence application for the construction of a final repository for spent nuclear fuel. The report represented the culmination of work conducted by SKB over several years, focusing on the goal of making the licence application in late 2009. Results from the SR-Can project have been documented in several...
Content type: Publications -
2008:08 SSI:s independent consequence calculations in support of the regulatory review of the SR-Can safety assessment
With the publication of the SR-Can report at the end of 2006, Swedish Nuclear Fuel and Waste Management Co (SKB) have presented a complete assessment of long-term safety for a KBS-3 repository. The SR-Can project demonstrates progress in SKB’s capabilities in respect of the methodology for assessment of long-term safety in support of a licence application for a final repository. According to...
Content type: Publications -
2008:09 The Generalised Ecosystem Modelling Approach in radiological assessment
An independent modelling capability is required by SSI in order to evaluate dose assessments carried out in Sweden by, amongst others, SKB. The main focus is the evaluation of the long-term radiological safety of radioactive waste repositories for both spent fuel and low-level radioactive waste. To meet the requirement for an independent modelling tool for use in biosphere dose assessments,...
Content type: Publications -
2008:10 User’s manual for Ecolego Toolbox and the Discretization Block
The CLIMB modelling team (Catchment LInked Models of radiological effects in the Biosphere) was instituted in 2004 to provide SSI with an independent modelling capability when reviewing SKB’s assessment of long-term safety for a geological repository. Modelling in CLIMB covers all aspects of performance assessment (PA) from near-field releases to radiological consequences in the surface...
Content type: Publications -
2013:06 The sixth round of implementation according to PARCOM recommendation 91/4 – Report from Sweden
According to the PARCOM Recommendation 91/4 contracting parties shall, in accordance with the guidelines annexed to this recommendation, every four years present a statement on progress made in applying best available technology (BAT) in order to minimise and, as appropriate, eliminate any pollution caused by radioactive discharges from all nuclear industries, including research reactors and...
Content type: Publications -
2012:02 Evaluation of activity build-up experiments
This project aims to understand how the water chemistry affects the activity build-up on surfaces in different systems in Swedish nuclear power plants, which in turn provides information on conditions required to reduce the radiation exposure to power plant staff. The study was done to obtain knowledge about water chemistry conditions preferred to minimize the activity build-up. A number of...
Content type: Publications -
2020:16 Estimates ofJ-integral and COD for circumferential through wall cracks under global bending including the effect of pipe end restraint
SSM perspective Background Leak-before-break (LBB) piping assessments have shown that piping systems can withstand long through-wall cracks before pipe rupture is expected. This is somewhat because pipe ends are restrained. In LBB assessments analyses are often performed for a pipe segment uncoupled from the piping system, as pipe ends are assumed unrestrained. This assumption is conservative...
Content type: Publications -
2020:02 Models for axial gas flow and mixing in LWR fuel rods
SSM perspective Background Fission gases inside a fuel rod plays an important role in the behaviour of the fuel, both during normal operation and during events and accidents. Fission gases are released from inside the fuel pellets to the gap between the pellet and the cladding tube and then flow to the plenum volume at the top of the fuel rod. In high burnup fuel, this axial flow to the...
Content type: Publications -
2020:05 General data in accordance with the requirements in Article 37 of the Euratom Treaty
Decommissioning of the nuclear reactors Ringhals 1 and Ringhals 2 in Sweden...
Content type: Publications -
1996:08 Contamination and Radiation Exposure, Evaluation and Measures in the Nordic Countries after the Chernobyl Accident
In the night 25/26 April1986 it all started. The radioactive releases from Chernobyl reached the Nordic countries late 27 April. At noon the following day all the world knew that an accident had occurred - two and a half days after it started. In April.l986 there was, generally speaking, quite a high level of preparedness for nuclear accidents in the Nordic countries but still, as it was...