Filtered generated 45 hits.
-
2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper
The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...
Content type: Publications -
2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review
This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...
Content type: Publications -
2012:24 Technical Note, Initial Review of SR-Site Main Report
The Swedish Radiation Safety Authority (SSM) is reviewing a license application, which has been submitted by Svensk Kärnbränslehantering AB (SKB), for a repository for the final disposal of spent nuclear fuel. SKB’s Application includes an assessment of the long-term safety of the proposed repository. The assessment is known as SR-Site. This technical note records the findings from a...
Content type: Publications -
2012:29 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
De dokument i SR-Site som är relevanta till detta granskningsområde bedöms vara generellt i tillräckligt hög kvalitet för att utgöra underlagsmaterial för vidare granskning i huvudgranskningsfasen av SSM:s GLS- (granskning av långsiktig säkerhet) projekt. Behov av kompletterande information eller förtydliganden har dock identifierats inom...
Content type: Publications -
2012:26 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill - Chemical erosion processes
The SR-Site documentation relevant to this review topic was found to be of sufficiently high quality overall to justify further consideration in the Main Review Phase of SSM’s PCS (Post-closure safety) project. Several specific topics for which complementary information and clarifications should be requested from SKB were also identified (Appendix 2). Specific review topics for consideration...
Content type: Publications -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Content type: Publications -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
This technical note is part of a set of reviews for Swedish Radiation Safety Authority (SSM) by external experts to assist with the Initial Review Phase. The overall goal of the Initial Review Phase is for SSM to achieve a broad coverage of the information provided in SR-Site and its supporting references and in particular to identify where complementary information or clarifications need to...
Content type: Publications -
2012:52 Technical Note, Shear movement of near-field rock due to large earthquakes
The review assignment concentrates on the possible impact of large earthquakes on the shear deformation of large fractures in the repository volume. For this purpose a general review of some of SKB‘s top-level reports was carried out. The reports draw a generally consistent and to a considerable extend comprehensive picture of the potential impact on the repository integrity in case of the...
Content type: Publications -
2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Content type: Publications -
2012:48 Technical Note, Use of Solubility Limits in the SR-Site Safety Assessment
In a radioactive waste disposal environment, in some potential situations (scenarios) a disposed canister containing spent fuel may be breached and the fuel may come into contact with groundwater. The concentration of a radioactive element such as uranium may rise to a level where the solution is saturated. No more of the radioactive element may dissolve and a precipitated solid may be formed.
Content type: Publications