Filtered generated 146 hits.
-
2012:37 Technical Note, Selective review of the hydrogeological aspects of SR-Site
This review of the hydrogeology is selective. It focuses on the measurement, interpretation and modelling of the potential repository host rock, that is the rock domain FFM01<-400m. It accepts as reasonably accurate the measurement and representation of the more transmissive parts of the hydrogeological system, particularly the near-surface 150m in the form presented by SKB. SKB have decided...
Content type: Publications -
2012:15 Technical Note, A review of the mechanical integrity of the canister
An introductory review of SR-Site has been conducted with respect to the mechanical integrity of the canister. The review is focused on the copper canister and the nodular cast iron insert. Review results show that a number of loads and loading scenarios for the copper canister has not been analysed by SKB. The importance of sufficient creep ductility of the copper material and sufficient...
Content type: Publications -
2012:30 Technical Note, Initial review of physical properties and processes of the buffer and backfill. THM and other physical processes
The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...
Content type: Publications -
2012:25 Workshop on Seismology
This report summarizes the issues discussed at the workshop and extracts the essential viewpoints that have been expressed. The report is not to consider as a comprehensive record of all the discussions at the workshop and individual statements made by workshop participants should be regarded as opinions rather than proven facts. This report includes, apart from the workshop synthesis, the...
Content type: Publications -
2012:28 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
This report consists of a Technical Note in SSM’s initial review phase of SKB’s safety analysis SR-Site. The aim of the initial review of issues concerning geochemical processes in buffer and backfill in a final repository is to make a broad illustration and review of SR-Site together with its subordinate references, as well as to identify potential needs for complementary information or...
Content type: Publications -
2017:02 Slow strain rate testing of copper in sulfide rich chloride containing deoxygenated water at 90 °C
Background Stress corrosion cracking (SCC) can occur in materials from the combined influence of tensile stress and a corrosive environment. It has previously been shown in the literature, that copper can be sensitive to SCC in the presence of sulfide containing water. Since both tensile stresses are present as well as a material were SCC can occur, SCC could potentially be a problem for the...
Content type: Publications -
2017:28 SSM’s external experts’ review of SKB’s safety assessment SR-PSU - hydrogeology, geochemistry and bentonite
Background The Swedish Radiation Safety Authority (SSM) received an application for the expansion of SKB's final repository for low and intermediate level waste at Forsmark (SFR) on the 19 December 2014. SSM is tasked with the review of the application and will issue a statement to the government who will decide on the matter. An important part of the application is SKB's assessment of...
Content type: Publications -
2019:24 SSM's external experts' review of SKB's analysis of long-term safety of 1BMA (SFR)
SSM perspective Background Fractures in the concrete barrier of the rock vault 1BMA in the final repository for low and intermediate level waste (SFR) have been observed. The Swedish Radiation Safety Authority (SSM) enforced Swedish Nuclear Fuel and Waste Management Company (SKB) to assess the long-term radiological consequences of 1BMA (SSM2015-2432-26) given the present state of the rock...
Content type: Publications -
2015:47 GEMA-Site 1: Model description and example application
Background In 2011 the Swedish Nuclear Fuel and Waste Management Company (SKB) submitted an assessment of the long-term safety of a KBS-3 geological disposal facility for spent nuclear fuel in Forsmark, Sweden. This assessment, the SR-Site project, supports the licence application of SKB to build such a final disposal facility. The biosphere dose assessment carried out as part of SR-Site...
Content type: Publications -
2016:16 Technical Note, Possible influence from stray currents from high voltage DC power transmission on copper canisters
Main Review Phase Introduction As part of the Swedish Radiation Safety Authority’s (SSM) review of the Swedish Nuclear Fuel and Waste management company (SKB) license application for a final storage for spent nuclear fuel, SSM has asked for complementary information regarding the effect of stray currents from high voltage cables on copper corrosion (SSM 2012). SKB therefore has performed an...
Content type: Publications