Search

Filtered generated 45 hits.

Sort on:

Relevance Date
  • 2012:51 Technical Note, Rock Mechanics related to long-term repository and site evolution

    In general, SKB demonstrates that they have accumulated a significant set of hydraulic, mechanical and thermal data that is essential for constructing a deep geological repository. The method of data acquisition is robust using the internationally- recognized and suggested methods. The methodology of safety assessment is firmly established by applying the state-of-the-art technology and...

    Content type: Publications
  • 2012:33 Technical Note, Review of Groundwater Chemistry in SKB’s Safety Assessment SR-Site

    This initial review examined SKB’s characterization of groundwater chemistry at the Forsmark site and its evolution during long time periods under different possible climates in the future. The review considered whether the geochemical data provided by SKB are reasonable and sufficient and whether the methods used by SKB for projecting geochemical conditions into the future are appropriate.

    Content type: Publications
  • 2012:41 Technical Note, Hydrogeological conditions at the Forsmark site

    The hydrogeological site description and groundwater models employed in support of SR-Site, in many ways, represent advances in the state of the art for crystalline bedrock where groundwater moves mainly through fractures. Advanced methods are used for representing water-conducting natural features on scales from kilometres down to a meter, as well as excavated portions of the repository...

    Content type: Publications
  • 2012:08 Deterministic Assessment of Future Costs for Dismantling (FA)

    In this study a model for advanced deterministic cost calculation has been used to find a parametric value on the cost for dismantling of the FA-facility. The study gives good description of good practise to collect, test and utilise input data in a systematic way in order to make prudent cost estimates for any particular nuclear installation The Swedish Law stipulates that future expenses...

    Content type: Publications
  • 2012:30 Technical Note, Initial review of physical properties and processes of the buffer and backfill. THM and other physical processes

    The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...

    Content type: Publications
  • 2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review

    This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...

    Content type: Publications
  • 2012:59 Technical Note, Initial review phase – Dose Assessment Methodology

    This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...

    Content type: Publications
  • 2012:46 Technical Note, Review of Landscape Models used in SR-Site

    As part of SSM’s Initial Review phase of SKB’s SR-Site safety assessment for the proposed final disposal of spent nuclear fuel at the Forsmark site, Quintessa was given the assignment to consider whether the landscape models and supporting data utilised by SKB are appropriate and fit for purpose. This Technical Note summarises the findings of Quintessa’s review. SKB’s approach to the...

    Content type: Publications
  • 2012:06 Decommissioning Cost Assessment

    The future costs for dismantling, decommissioning and handling of associated radioactive waste of nuclear installations represents substantial liabilities. It is the generations that benefits from the use of nuclear installations that shall carry the financial burden. Nuclear waste programmes have occasionally encountered set-backs related to the trust from society. This has resulted in...

    Content type: Publications
  • 2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper

    The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...

    Content type: Publications