Filtered generated 759 hits.
-
2016:23 Technical Note, Modelling of the thermal evolution of the KBS-3 repository at Forsmark and associated induced seismic activity
Main Review Phase Introduction The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of the KBS-3 repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain...
Content type: Publications -
2016:05 Technical Note, Assessment of SKB TR-14-15 Assessment of SKB TR-14-15 “Possible influence from stray currents from high voltage DC power transmission on copper canisters”
The general objective of the present project is to provide independent review comments for one area of SKB:s post closure safety analysis, SR-Site. With this in mind, the purpose of this report is to review SKB’s presentation on possible influence from stray currents from high voltage DC power transmission on a repository for nuclear fuel. Laust B Pedersen SSM English The general objective of...
Content type: Publications -
2016:09 SSM’s external experts’ reviews of SKB’s safety assessment SR-PSU – radionuclide transport, dose assessment, and safety analysis methodology
Initial review phase SSM English Initial review phase...
Content type: Publications -
2016:02 Technical Note, An updated review of the creep ductility of copper including the effect of phosphorus
Kjell Pettersson SSM English...
Content type: Publications -
2017:37 Non-Ionising Radiation in Swedish Health Care
Jonna Wilén, Kjell Hansson Mild, Ronnie Lundström SSM English...
Content type: Publications -
2014:50 Technical Note, A Study of Availability of Fuel Data for Sweden’s Spent Nuclear Fuel
The study covers all types spent fuel planned to be placed in the final repository. It was carried out by selecting a sample of spent fuel and investigating the information available at the Nuclear Power Plants (NPP’s) in Sweden, the Central interim storage facility (Clab) and Studsvik. The results indicate that the required data is available and can be obtained for fuel unloaded after 1980.
Content type: Publications -
2012:35 Technical Note, Review of SKB’s Code Documentation and QA for the SR-Site Safety Assessment
This initial review examined the Swedish Nuclear Fuel and Waste Management Company (SKB) code documentation and quality assurance, which is important to the safety assessment SR-Site because the computer codes used must be both suitable for the analyses performed and capable of producing accurate results for those analyses. SKB has prepared a report that summarizes the code documentation...
Content type: Publications -
2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review
This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...
Content type: Publications -
2012:29 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
De dokument i SR-Site som är relevanta till detta granskningsområde bedöms vara generellt i tillräckligt hög kvalitet för att utgöra underlagsmaterial för vidare granskning i huvudgranskningsfasen av SSM:s GLS- (granskning av långsiktig säkerhet) projekt. Behov av kompletterande information eller förtydliganden har dock identifierats inom...
Content type: Publications -
2012:26 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill - Chemical erosion processes
The SR-Site documentation relevant to this review topic was found to be of sufficiently high quality overall to justify further consideration in the Main Review Phase of SSM’s PCS (Post-closure safety) project. Several specific topics for which complementary information and clarifications should be requested from SKB were also identified (Appendix 2). Specific review topics for consideration...
Content type: Publications