  • SKI Report 2008:01 Reliability Data for piping Components in Nordic Nuclear Poer Plants "R-Book" Project Phase 1

    SKI Report 2008:01 - “Reliability Data for Piping Components in Nordic Nuclear Power Plants - R-Book Project Phase I” – is a planning document for a new R&D project to develop a piping component reliability parameter handbook for use in probabilistic safety assessment (PSA) and related activities. Included in this handbook will be pipe leak failure rates and rupture frequencies that are...

    Content type: Publications
  • 2010:16 Guidance to Risk-Informed Evaluation of Technical Specifications using PSA

    No guidance documents for risk-informed analysis and assessment of changes in Limiting Conditions for Operation (LCO:s) in TS (Technical Specifications) have been available in the Nordic countries. In the U.S. several guidance documents, primarily developed by the owners groups for PWRs and BWRs, exist. Guidance for analysis of TS changes in this report generally follows the U.S. Regulatory...

    Content type: Publications
  • 2007:26 Safety Culture Enhancement Project Final Report

    At the International Conference on Safety Culture in Nuclear Installations, organized by IAEA in 2002, one concluding remark was that the regulators should encourage a sincere interest in safety culture among licensees. In line with this SKI wanted to explore a proactive path to encourage the licensees in their safety culture work. SKI also had the ambition to gain more information on the MTO...

    Content type: Publications
  • 2010:42 Using the EPRI Risk-Informed ISI Methodology on Piping Systems in Forsmark 3

    In the SSM regulation SSMFS 2008:13, it is stated that the selection of locations for inspection of mechanical components shall be based upon the risk for core damage or the risk of release of radioactive substances. Both qualitative and quantitative measures of the relative risk are allowed to be used. So far only the PWRs in Sweden are using a quantitative procedure to evaluate the risk...

    Content type: Publications
  • 2009:07 Dependency Analysis Guidance Nordic/German Working Group on Common Cause Failure analysis

    The Regulatory Code SSMFS 2008:1 of Swedish Radiation Safety Authority (SSM) includes requirements regarding the performance of probabilistic safety assessments (PSA), as well as PSA activities in general. Therefore, the follow-up of these activities is part of the inspection tasks of SSM. According to the SSMFS 2008:1, the safety analyses shall be based on a systematic identification and...

    Content type: Publications
  • 2009:27 Analysis Strategy for Fracture Assessment of Defects in Ductile Materials

    SSM has supported research for investigating the role of secondary stresses when fracture assessments are performed for cracked structures made of ductile materials. There are evidences that indicate that some secondary stresses, such as weld residual stresses, are not as important as primary stresses for estimating the safety margin against rupture (measured by the J-integral) for the type...

    Content type: Publications
  • 2010:46 Development of the PRO-LOCA Probabilistic Fracture Mechanics Code, MERIT Final Report

    The MERIT project has been an internationally financed program with the main purpose of developing probabilistic models for piping failure of nuclear components and to include these models in a probabilistic code named PRO-LOCA. The principal objective of the project has been to develop probabilistic models for piping failure of nuclear components and to include these models in a...

    Content type: Publications
  • 2007:41 Dependency Analysis Guidence, Nordic/German Working Group on Common cause Failure analysis Phaase 1 project report: Comparison and application to test cases

    The report “Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases” presents a common attempt by the authorities and the utilities to create a methodology and experience base for defence and analysis of dependent failures. The performed benchmark application has shown that how the data is interpreted is of significant...

    Content type: Publications
  • 2007:25 Safety Management Characteristics Reflected in Interviews at Swedish Nuclear Power Plants: A System Perspective Approach

    The study used the themes identified in an earlier study: definitions of safety management, the structure of the organizations, organizational change, regulatory and operational activities, safety strategy, threats to safety, information management and feedback, incident and accident reminders on different aspects of safety management in the nuclear context. reporting, and measurement of...

    Content type: Publications
  • 1997:12 Study of International Published Experiences in Joining Copper and Copper-alloys

    This study has revealed a number of joining processes to be used when manufacturing copper-canisters for the final storage of high level nuclear waste. However, the decision on which material and which joining process to be used has to be based on the design criterions. The welding procedure has to be qualified i.e, it shall be demonstrated whether the procedure is capable of fulfilling...

    Content type: Publications