Filtered generated 375 hits.
-
2010:46 Development of the PRO-LOCA Probabilistic Fracture Mechanics Code, MERIT Final Report
The MERIT project has been an internationally financed program with the main purpose of developing probabilistic models for piping failure of nuclear components and to include these models in a probabilistic code named PRO-LOCA. The principal objective of the project has been to develop probabilistic models for piping failure of nuclear components and to include these models in a...
Content type: Publications -
2010:42 Using the EPRI Risk-Informed ISI Methodology on Piping Systems in Forsmark 3
In the SSM regulation SSMFS 2008:13, it is stated that the selection of locations for inspection of mechanical components shall be based upon the risk for core damage or the risk of release of radioactive substances. Both qualitative and quantitative measures of the relative risk are allowed to be used. So far only the PWRs in Sweden are using a quantitative procedure to evaluate the risk...
Content type: Publications -
2010:16 Guidance to Risk-Informed Evaluation of Technical Specifications using PSA
No guidance documents for risk-informed analysis and assessment of changes in Limiting Conditions for Operation (LCO:s) in TS (Technical Specifications) have been available in the Nordic countries. In the U.S. several guidance documents, primarily developed by the owners groups for PWRs and BWRs, exist. Guidance for analysis of TS changes in this report generally follows the U.S. Regulatory...
Content type: Publications -
2009:27 Analysis Strategy for Fracture Assessment of Defects in Ductile Materials
SSM has supported research for investigating the role of secondary stresses when fracture assessments are performed for cracked structures made of ductile materials. There are evidences that indicate that some secondary stresses, such as weld residual stresses, are not as important as primary stresses for estimating the safety margin against rupture (measured by the J-integral) for the type...
Content type: Publications -
2009:15 Improvement and Validation of Weld Residual Stress Modelling Procedure
Weld residual stresses have a large influence on the behavior of cracks growing under normal operation loads and on the leakage-flow from a through-wall crack. Accurate prediction of these events is important in order to arrive at proper conclusions when assessing detected flaws, for inspection planning and for assessment of leak-before-break margins. Therefore, it is very important to have...
Content type: Publications -
2009:13e 2009 assessment of radiation safety in the Swedish nuclear power plants
This report has been prepared by order of the Swedish government in accordance with the “Governmental directive for the financial year 2009 regarding the Swedish Radiation Safety Authority”. The Swedish Radiation Safety Authority has through its supervision ensured a comprehensive basis for this overall assessment of radiation safety. The overall conclusion is that the radiation safety,...
Content type: Publications -
2006:15e Safety and Radiation Protection at Swedish Nuclear Power Plants 2005
The safety philosophy upon which the Swedish Nuclear Power Inspectorate’s (SKI) supervisory and regulatory activities are based assume that multiple physical barriers will exist and that a plant-specific defence-in-depth system will be implemented at each plant and that the licensee bears the undivided responsibility for safety. The physical barriers are situated between the radioactive...
Content type: Publications -
2005:32e Safety and Radiation Protection at Swedish Nuclear Power Plants 2004
The safety philosophy upon which the Swedish Nuclear Power Inspectorate’s (SKI) supervisory and regulatory activities are based assume that multiple physical barriers will exist and that a plant-specific defence-in-depth approach will be implemented at each plant. The physical barriers are situated between the radioactive material and the plant personnel and surroundings. In the case of...
Content type: Publications -
2005:61 Review and Assessment of SCC Experiments with RPV Steels in Oskarshamn 2 and 3 (ABB Report SBR 99-020)
Although the extent of cracking was rather surprising for a bolt-loaded specimen, the average stress corrosion crack growth rate of 0.5 mm/year over the five-year testing period does not represent an immediate concern. The overwhelming part of crack growth can have occurred during a 20 day chloride transient during the third year of exposure because of a condenser leakage after an outage. The...
Content type: Publications -
2004:16e Statement of the Situation Concerning Safety and Radiation Protection at Swedish Nuclear Plants in 2003
The safety philosophy upon which the Swedish Nuclear Power Inspectorate’s (SKI) supervisory and regulatory activities are based assumes that multiple physical barriers will exist and that a plant-specific defence-in-depth system will be implemented at each plant. The physical barriers are situated between the radioactive material and the plant personnel and surroundings. In the case of...
Content type: Publications