Filtered generated 401 hits.
-
2016:05 Technical Note, Assessment of SKB TR-14-15 Assessment of SKB TR-14-15 “Possible influence from stray currents from high voltage DC power transmission on copper canisters”
The general objective of the present project is to provide independent review comments for one area of SKB:s post closure safety analysis, SR-Site. With this in mind, the purpose of this report is to review SKB’s presentation on possible influence from stray currents from high voltage DC power transmission on a repository for nuclear fuel. Laust B Pedersen SSM English The general objective of...
Content type: Publications -
2015:25 Design Guide for Nuclear Civil Structures (DNB)
The Swedish Radiation Safety Authority (SSM) and the Swedish licensees have previously in a jointly funded research project developed a design guide for civil structures at Swedish nuclear facilities to be based on Eurocodes, DNB. The report was published in January 2014 as SSM Report 2014:06. To further improve DNB and to ensure that the fundamentals of the recommendations will be applied...
Content type: Publications -
2016:02 Technical Note, An updated review of the creep ductility of copper including the effect of phosphorus
Kjell Pettersson SSM English...
Content type: Publications -
2015:40 Technical Note, Assessment of flow-related transport parameters used in the SR-Site safety case
Joel E. Geier SSM English...
Content type: Publications -
2015:41 Technical Note, Hydrogeological aspects of future human actions for a repository at Forsmark
Joel E. Geier SSM English...
Content type: Publications -
2015:45 Technical Note, Parallel assessment of effects on non-human biota using RESRAD-BIOTA
Karolina Stark SSM English...
Content type: Publications -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Content type: Publications -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
This technical note is part of a set of reviews for Swedish Radiation Safety Authority (SSM) by external experts to assist with the Initial Review Phase. The overall goal of the Initial Review Phase is for SSM to achieve a broad coverage of the information provided in SR-Site and its supporting references and in particular to identify where complementary information or clarifications need to...
Content type: Publications -
2012:67 Technical Note, Hydrogeological modelling of the Forsmark site
A modelling study has been conducted using discrete-fracture network (DFN) models in combination with discrete-feature hydrogeological modelling methods for representation of other potentially conductive features such as the disturbed zone around repository tunnels. The principal results consist of hydraulic and transport property estimates for discrete-fracture network (DFN) models on block...
Content type: Publications -
2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Content type: Publications