Search

Filtered generated 213 hits.

Sort on:

Relevance Date
  • 2012:42 Technical Note, Initial review of physical properties and processes of the buffer and backfill – Installation and initial state

    The technical note briefly summarises the proposed designs and functions of the buffer and backfill, and examines SKB’s progress in manufacturing, installing and testing its proposed solutions. In brief, the review suggests that there are some procedural and practical engineering aspects (e.g., quality assurance procedures, backfilling rates) and several physical processes to do with the...

    Content type: Publications
  • 2018:21 Research on Resaturation of Bentonite Buffer

    Background Resaturation processes in the bentonite buffer in a KBS-3 type repository for spent nuclear fuel are complicated and are often illustrated, analysed and modelled multi-disciplinarily as coupled thermal (T), hydrological (H) and mechanical (M) processes with multi-phase flow, elastoplastic evolution in a swelling porous medium. Previous THM-modelling showed that the re-saturation...

    Content type: Publications
  • 2011:22 Infiltration of dilute groundwaters and resulting groundwater compositions at repository depth

    The planned Swedish concept for final disposal of spent nuclear fuel includes copper canisters placed in deposition holes at about 500 m depth in granitic bedrock. The copper canisters will be surrounded by bentonite buffer with the objective of inhibiting groundwater flow adjacent to the canister. It has been discovered that dilute glacial melt-water may induce erosion of the buffer material.

    Content type: Publications
  • 2011:09 Is Copper Immune to Corrosion When in Contact With Water and Aqueous Solutions?

    The KBS-3concept implies that spent nuclear fuel is placed in copper canisters surrounded by clay and finally placed approximately 500 m down from surface into granitic bedrock, in order to isolate the spent nuclear fuel from humans and environment for very long time scales (i.e. millions of years). The concept is based on the multi-barrier principle, in this respect the barriers are the...

    Content type: Publications
  • 2011:08 Workshop on Copper Corrosion and Buffer Erosion Stockholm 15-17 September 2010

    In SSM:s preparation for reviewing SKB:s license application for disposal of spent nuclear fuel, a series of technical workshops have been conducted. The main purpose of this type of workshops is to get an overall understanding of the state of knowledge on interdisciplinary issues as well as of questions in the research front by inviting several experts. Previous workshops have addressed the...

    Content type: Publications
  • 2011:21 Workshop on spent fuel performance and radionuclide chemistry -Rånäs 2010: Assessment of some outstanding issues

    The safety assessment for final disposal of spent nuclear fuel has to comprehensively address the stage when containment barriers have failed and when radionuclide releases occur to the surrounding groundwater at repository depth. Essential processes for estimating risk/dose related to this scenario involve the release of radionuclide from the spent fuel surfaces due to radio-lytic oxidative...

    Content type: Publications
  • 2011:07 Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    The Swedish Radiation safety Authority (SSM) is currently developing project plans for the review of the Swedish Nuclear Fuel and Waste Management Co’s (SKB) planned license application for a spent nuclear fuel repository in Forsmark and an encapsulation plant in Oskarshamn. In support of the development of these project plans, SSM has carried out several international workshops during 2010...

    Content type: Publications
  • 2010:43 Displacement along extensive deformation zones at the two SKB sites: Forsmark and Laxemar

    The Fennoscandian shield is distinguished by that the exposed bedrock is mainly composed of Precambrian metamorphic and igneous rocks older than a billion or one and a half billion years with few easily distinguished testimonies for the younger history. Large parts of the present ground surface closely coincides with a late Precambrian denudation surface; the sub-Cambrian peneplain.

    Content type: Publications
  • 2010:24 On Cost Estimate for Decommissioning of one Isotope Central

    The present generation has the responsibility to ensure and guarantee that sufficient financial resources are accrued into the Swedish Nuclear Waste Fund to cover all future costs. Thus, the next generation, as well as any succeeding generations, will have the financial resources required in order to undertake the necessary measures, in an appropriate manner, for the decommissioning and...

    Content type: Publications
  • 2010:33 Lineament interpretation Short review and methodology

    This report concerns a study which was initially conducted for the Swedish Nuclear Power Inspectorate (SKI), which is now merged into the Swedish Radiation Safety Authority (SSM). The conclusions and viewpoints presented in the report are those of the author and do not necessarily coincide with those of the SSM. In the characterization of a site that may have potential for hosting a...

    Content type: Publications