  • 2012:26 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill - Chemical erosion processes

    The SR-Site documentation relevant to this review topic was found to be of sufficiently high quality overall to justify further consideration in the Main Review Phase of SSM’s PCS (Post-closure safety) project. Several specific topics for which complementary information and clarifications should be requested from SKB were also identified (Appendix 2). Specific review topics for consideration...

    Content type: Publications
  • 2012:10 Technical Note, Review of the Geomicrobiological Aspects of SKB’s Licence Application for a Spent Nuclear Fuel Repository in Forsmark, Sweden

    The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...

    Content type: Publications
  • 2012:03 The IAEA Integrated Regulatory Review Service Mission to Sweden in February 2012

    The Swedish Government decided on January 22, 2009 to mandate the Swedish Radiation Safety Authority, SSM, to apply for an international review of the Author-ity and its areas of supervision, an ‘IRRS’ (Integrated Regulatory Review Service) carried out by the International Atomic Energy Agency (IAEA). On February 25, 2009, SSM made a formal request to the IAEA for an IRRS in Sweden. The time...

    Content type: Publications
  • 2012:51 Technical Note, Rock Mechanics related to long-term repository and site evolution

    In general, SKB demonstrates that they have accumulated a significant set of hydraulic, mechanical and thermal data that is essential for constructing a deep geological repository. The method of data acquisition is robust using the internationally- recognized and suggested methods. The methodology of safety assessment is firmly established by applying the state-of-the-art technology and...

    Content type: Publications
  • 2012:33 Technical Note, Review of Groundwater Chemistry in SKB’s Safety Assessment SR-Site

    This initial review examined SKB’s characterization of groundwater chemistry at the Forsmark site and its evolution during long time periods under different possible climates in the future. The review considered whether the geochemical data provided by SKB are reasonable and sufficient and whether the methods used by SKB for projecting geochemical conditions into the future are appropriate.

    Content type: Publications
  • 2012:68 Assessment of cost for dismantling of Ringhals 2 PWR

    The Financing Act stipulates that future expenses for dismantling of Nuclear Power Plants (NPP) shall be financed from segregated funds that are supervised by the Swedish Nuclear Waste Fund (SNWF). Transparency of and confidence in the process to ensure collection of sufficient funds is fundamental for the acceptance and sustainability of the Swedish model for estimating environmental...

    Content type: Publications
  • 2012:41 Technical Note, Hydrogeological conditions at the Forsmark site

    The hydrogeological site description and groundwater models employed in support of SR-Site, in many ways, represent advances in the state of the art for crystalline bedrock where groundwater moves mainly through fractures. Advanced methods are used for representing water-conducting natural features on scales from kilometres down to a meter, as well as excavated portions of the repository...

    Content type: Publications
  • 2012:08 Deterministic Assessment of Future Costs for Dismantling (FA)

    In this study a model for advanced deterministic cost calculation has been used to find a parametric value on the cost for dismantling of the FA-facility. The study gives good description of good practise to collect, test and utilise input data in a systematic way in order to make prudent cost estimates for any particular nuclear installation The Swedish Law stipulates that future expenses...

    Content type: Publications
  • 2012:30 Technical Note, Initial review of physical properties and processes of the buffer and backfill. THM and other physical processes

    The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...

    Content type: Publications
  • 2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review

    This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...