Search

Filtered generated 123 hits.

Sort on:

Relevance Date
  • 2012:68 Assessment of cost for dismantling of Ringhals 2 PWR

    The Financing Act stipulates that future expenses for dismantling of Nuclear Power Plants (NPP) shall be financed from segregated funds that are supervised by the Swedish Nuclear Waste Fund (SNWF). Transparency of and confidence in the process to ensure collection of sufficient funds is fundamental for the acceptance and sustainability of the Swedish model for estimating environmental...

    Content type: Publications
  • 2012:31 Decommissioning of the Nuclear Reactors R2 and R2-0 at Studsvik, Sweden – General Data as called for under Article 37 of the Euratom Treaty

    The report describes the plans for decommissioning of the nuclear research and material test reactors R2 and R2-0, situated at the Studsvik site in Sweden. The purpose of the document is to serve as information for the European Commission, and to fulfil the requirements of Article 37 of the Euratom Treaty. According to Article 37, each Member State shall provide the Commission with such...

    Content type: Publications
  • 2012:22 A dosimetric intercomparison between the radiation therapy clinics in Sweden

    In general the study showed a good agreement between the results from the audit team and the local team. The examination of the reference dosimetry showed an excellent agreement between the absorbed dose determined by the audit team and the local team. The spread of the results among the Swedish radiotherapy departments was much lower as compared to similar studies conducted in other...

    Content type: Publications