Search

Showing 3314 hits for ””

Sort on:

Relevance Date
  • 2012:39 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the construction of a KBS-3 repository at the Forsmark site – Initial Review Phase

    In general, the reviewers find that the level of geomechanics data collected and synthesized to date has been impressive in scope and high in quality. The data collected has been incorporated into interlinked analyses concerning construction and operational performance of the repository. There are a number of uncertainties in the data and subsequent analyses that are unavoidable when dealing...

    Content type: Publications
  • 2012:11 Issues in the corrosion of copper in a Swedish high level nuclear waste repository

    The objective with this research project was to increase knowledge in the area of copper corrosion in the planned repository environment and obtain information on how copper corrosion evolves during the assessment period of 100 000 years. The equilibrium chemical composition of groundwater close to the canister as a function of temperature has been calculated by use of a thermodynamics code...

    Content type: Publications
  • 2012:55 Technical Note, Review of SKB’s Radionuclide Transport Methodology

    As part of SSM’s Initial Review Phase of SKB’s SR-Site safety assessment of the final disposal of spent nuclear fuel at the Forsmark site, Quintessa has been requested by SSM to consider whether SKB’s methodology to abstract FEPs (features, events, processes), as well as site information and other data, into assessment models for radionuclide transport is appropriate and sufficient for its...

    Content type: Publications
  • 2012:38 Technical Note, Radiological effects on non-human biota - initial review

    The focus of this review was SKB’s assessment of radiological effects on non-human biota in SR-Site according to present regulations and guidance from SSM and it was conducted by Karolina Stark at the Department of Systems Ecology, Stockholm University. In short, the results from this review show that the completeness of the safety assessment can be questioned regarding considered...

    Content type: Publications