Search

Showing 3314 hits for ””

Sort on:

Relevance Date
  • 2012:54 Technical Note, Initial Review Phase for SKB´s safety assessment SR-Site: Geological structures and deformation zones, from site investigation to safety assessment

    The site selected by the Swedish Nuclear Fuel and Management Co (SKB) for location of a deep geological repository, i.e. a storage for spent nuclear fuel at about 500 m depth in Precambrian metamorphosed rocks. The location of the site is Forsmark at the northern coast of Uppland and 122 km north of Stockholm. In geological terms Forsmark is located in the central part of the Fennoscandian...

    Content type: Publications
  • 2012:37 Technical Note, Selective review of the hydrogeological aspects of SR-Site

    This review of the hydrogeology is selective. It focuses on the measurement, interpretation and modelling of the potential repository host rock, that is the rock domain FFM01<-400m. It accepts as reasonably accurate the measurement and representation of the more transmissive parts of the hydrogeological system, particularly the near-surface 150m in the form presented by SKB. SKB have decided...

    Content type: Publications
  • 2012:34 Technical Note, Review of FEP Handling in the SR-Site Safety Assessment: Initial Review Phase

    On 16th March 2011 the Swedish Nuclear Fuel and Waste Management Company, SKB, submitted applications for licences to construct a spent nuclear fuel encapsulation facility in Oskarshamn and a repository for final disposal of the encapsulated fuel in Forsmark. SKB’s applications are currently being reviewed by the Swedish Radiation Safety Authority, SSM, and the Land and Environmental Court in...

    Content type: Publications
  • 2012:28 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes

    This report consists of a Technical Note in SSM’s initial review phase of SKB’s safety analysis SR-Site. The aim of the initial review of issues concerning geochemical processes in buffer and backfill in a final repository is to make a broad illustration and review of SR-Site together with its subordinate references, as well as to identify potential needs for complementary information or...

    Content type: Publications
  • 2012:18 Technical Note, SR-Site Independent Modelling of Engineered Barrier Evolution and Coupled THMC: Contribution to the Initial Review Phase

    This review has focussed mainly on the modelling of the Engineered Barrier System (EBS) evolution, which includes coupled thermal, hydraulic, mechanical and chemical (THMC) processes. Additionally, the role of the EBS in the wider safety case was reviewed, including its treatment in scenarios and its representation in conceptual models since this provided the motivation for the modelling work...

    Content type: Publications
  • 2011:11 Handling Interfaces and Time-varying Properties in Radionuclide Transport Models

    Quintessa’s QPAC code has been used to investigate the Qeq approach. The conclusions from this simulation study are the following. The basic approach to calculating Qeq values is sound, however, narrow channels could lead to the same release as larger fractures with the same pore velocity, so a channel enhancement factor of √10 should be considered. A spalling zone that increases the area of...

    Content type: Publications
  • 2010:23 On Decommissioning Costs of the Ranstad Site

    A demanding task for the present generation is to assure that appropriate financial resources are injected into the Swedish Nuclear Waste Fund. It will thereby be possible for coming generations to undertake efficient measures in the decommissioning and dismantling of older nuclear facilities. To undertake such measures in the context of Swedish as well as European environmental and health...

    Content type: Publications
  • 2009:31 A Review of the Decommissioning Costs of the Ranstad Site

    The main objective of this study has been to review the future cost to decommission and dismantling the industrial area at the site of the old uranium mine at Ranstad in Sweden. Analyses of some detailed comparative empirical information have been used in the context of preliminary “bench-marking” studies. The estimated costs for decommissioning of the old uranium mine in Ranstad have been...

    Content type: Publications
  • 2009:22 Alternative modelling of brittle structures in a sub-area of the SKB candidate area at Forsmark, eastern Sweden

    A reasonable understanding of the character of the bedrock hosting a deep geological repository, i.e. the natural barrier, is an important component in the safety assessment of the deep geological repository for spent nuclear fuel. The structures in the rock, together with the regional stress field, affect the mechanical stability of the bedrock and the ground water transport within the...

    Content type: Publications
  • 2007:11 Review of Quality Assurance in SKBs Repository Research Experiments

    SKB is preparing a license application for the construction of a final repository for spent nuclear fuel in Sweden. This application will be supported by the safety assessment SR-Site for the post-closure phase. As a preparation for SR-Site SKB has recently produced the SRCan safety assessment, which is currently in review. The assessment of long-term safety is based on a broad range of...

    Content type: Publications