2007:05 Development of an Input Model to MELCOR 1.8.5 for Oskarshamn 3 BWR
An input model has been prepared for the Oskarshamn 3 rector. Demonstrations calculations, at current nominal operating conditions in Oskarshamn 3 for 3300 MW thermal power, were performed for three cases: (1) initial, steady-state conditions, (2) total loss of AC power and (3) large steam line LOCA. The results are presented in the report. 200 Lars Nilsson SKI English An input model has been...
Innehållstyp: Publikationer -
2007:02 Stakeholder involvement in Swedish nuclear waste management
This report have attempted to show the development of stakeholder involvement in the siting of a final repository for Sweden’s spent nuclear fuel as resembling something other than a straightforward linear process of improvement and refinement. Stakeholder involvement has developed, over the past 15 years or so, in something more like a patchwork of different shapes and forms. Some of the...
Innehållstyp: Publikationer -
2007:03 Variability and Uncertainties of Key Hydrochemical Parameters for SKB Sites
An important part of the site investigations conducted by the Swedish Nuclear Fuel and Waste Management Company (SKB) is the characterisation of groundwater chemical conditions in the deep bedrock environment where a final repository for spent nuclear fuel is planned to be located. This work is currently in its final stages at the two candidate sites, Forsmark and Laxemar, and should be...
Innehållstyp: Publikationer -
2007:07 DECOVALEX-THMC Project - Task A
This report presents the definition of the first phase, Task A-1, of the Task A of the international DECOVALEX project. The task is a working example of how interaction between THMC modelling and SA analysis could be performed. Starting with the technical definition of the Task A, the report presents the results of preliminary THM calculations with a purpose of an initial appreciation of the...
Innehållstyp: Publikationer -
2007:09 DECOVALEX-THMC - Task C
This report describes the results of Task C1 of the international DECOVALEX– THMC project devoted to Excavation Damage Zone (EDZ) in argillaceous rock at the Tournemire site in France. Task C of the project is aimed to understand the physical phenomena induced by excavation in the argillaceous rock. The task is to develop adequate numerical models for interpretation of observed damaged zones...
Innehållstyp: Publikationer -
2007:10 DECOVALEX-THMC - Task D
The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The name DECOVALEX stands for DEvelopment of COupled models and their VALidation against Experiments. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on...
Innehållstyp: Publikationer -
2007:02e Radiation Environment in Sweden, summary
The radiation environment to which the population of Sweden is exposed is dominated by medical investigations and background radiation from the ground and building materials in our houses. That is the conclusion of the first general Swedish summary of environmental monitoring data and dose calculations within the field of radiation. The report shows that people’s behaviour in the form of...
Innehållstyp: Publikationer -
2007:06 Probabilistic Safety Goals - Phase 1 -Status and Experiences in Sweden and Finland
Based on a series of interviews and on literature reviews as well as on a limited interna- tional over-view, the project has described the history and current status of safety goals in Sweden and Finland. A number of issues were discussed more in detail, including the status of the safety goals in view of the fact that they are often exceeded, strategies for handling violations of safety...
Innehållstyp: Publikationer -
2007:39 Influence of Crack Morphology on Leak Before Break Margins
The SKI regulation SKIFS 2004:2 allows for the use of Leak Before Break (LBB) as one way to provide assurance that adequate protection exists against the local dynamic consequences of a pipe break. The way to demonstrate that LBB prevails relies on a deterministic procedure for which a leakage crack is postulated in certain sections of the pipe based on the leak detection capability of the...
Innehållstyp: Publikationer -
2007:37 Identification of Common Cause Initiating Events Using the NEA IRS Database
The study carried out within the framework of this project is a continuation of work conducted for SKI in 1998 on the identification of Common Cause Initiators based on operational events documented in the NEA Incident Reporting System (IRS). This project covered the events reported in the IRS database with the incident date in the period of 1980- 01-01 – 2006-11-15. The events of highest...