  • 2007:06 Probabilistic Safety Goals - Phase 1 -Status and Experiences in Sweden and Finland

    Based on a series of interviews and on literature reviews as well as on a limited interna- tional over-view, the project has described the history and current status of safety goals in Sweden and Finland. A number of issues were discussed more in detail, including the status of the safety goals in view of the fact that they are often exceeded, strategies for handling violations of safety...

    Innehållstyp: Publikationer
  • 2007:39 Influence of Crack Morphology on Leak Before Break Margins

    The SKI regulation SKIFS 2004:2 allows for the use of Leak Before Break (LBB) as one way to provide assurance that adequate protection exists against the local dynamic consequences of a pipe break. The way to demonstrate that LBB prevails relies on a deterministic procedure for which a leakage crack is postulated in certain sections of the pipe based on the leak detection capability of the...

    Innehållstyp: Publikationer
  • 2007:04 Link Between RI-ISI and Inspection Qualification: Relationship between Defect Detection Rate and Margin of Detection

    A relationship has been established between defect detection ratio and margin of detection based on blind trails. The results are based on a rather small amount of data produced by personnel from one inspection laboratory but give us indications of how signal to noise ratio is possible to relate to the probability of detection (POD) used in RI-ISI models. The relationship need to be developed...

    Innehållstyp: Publikationer
  • 2007:14 Review of experimental data for modelling LWR fuel cladding behaviour under loss of coolant accident conditions

    This project has contributed to the research goal of giving a basis for SKIs supervision by means of evaluating experimental data and modelling the nuclear fuel cladding during a design base accident. The project has also contributed to the research goal to develop the competence about licensing of fuel at high burnup, which is an important safety issue. The results are useful as such, but...

    Innehållstyp: Publikationer
  • 2007:02e Radiation Environment in Sweden, summary

    The radiation environment to which the population of Sweden is exposed is dominated by medical investigations and background radiation from the ground and building materials in our houses. That is the conclusion of the first general Swedish summary of environmental monitoring data and dose calculations within the field of radiation. The report shows that people’s behaviour in the form of...

    Innehållstyp: Publikationer
  • 2006:36 Mechanical Integrity of Canisters Using a Fracture Mechanics Approach

    This report presents the methods and results of a research project for Swedish Nuclear Power Inspectorate (SKI) about numerical modeling of mechanical integrity of cast-iron canisters for the final disposal of spent nuclear fuel in Sweden, using combined boundary element (BEM) and finite element (FEM) methods The objectives of the project are: 1) to investigate the possibility of initiation...

    Innehållstyp: Publikationer
  • 2005:60 Research and Service Experience with Environmentally-Assisted Cracking in Carbon and Low-Alloy Steels in High-Temperature Water

    In this report, the most relevant aspects of research and service experience with environmentally assisted cracking of carbon and low-alloy steels in high-temperature water are reviewed, with special emphasis on the primary pressure-boundary components of boiling water reactors. The main factors controlling the susceptibility to environmentally assisted cracking under light water reactor...

    Innehållstyp: Publikationer
  • 2005:61 Review and Assessment of SCC Experiments with RPV Steels in Oskarshamn 2 and 3 (ABB Report SBR 99-020)

    Although the extent of cracking was rather surprising for a bolt-loaded specimen, the average stress corrosion crack growth rate of 0.5 mm/year over the five-year testing period does not represent an immediate concern. The overwhelming part of crack growth can have occurred during a 20 day chloride transient during the third year of exposure because of a condenser leakage after an outage. The...

    Innehållstyp: Publikationer
  • 02:4 Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    The work was finished and reported in Swedish in a limited publication 2000, Ingemansson Rapport H-14061-r-I. As the performed work was regarded to be of more general interest it is published again as a research report by the Swedish Nuclear Power Inspectorate. To be used in the international cooperation in nuclear safety it was also translated into English by the inspectorate, which is this...

    Innehållstyp: Publikationer
  • 2001:23 Interactions of Severe Accident Researchand Regulatory Positions (ISARRP)

    This project, started on April 1, 1999, had the specific objectives of determining whether; (i) the focus of the severe accidents (SA) research is consistent with that of the regulatory authorities, (ii) the results obtained so far by SA research satisfy the regulatory concerns, (iii) the future programs, envisaged will address the potential regulatory needs into next century, and (iv) how...

    Innehållstyp: Publikationer