Din avgränsning ger 128 träffar.
-
2014:57 Technical Note, Issues in the Corrosion of Copper in a Swedish High Level Nuclear Waste Repository: Phase III. Role of Sulphide Ion in Anodic and Cathodic Processes
The most important findings of this research project show that: In the case when the bentonite buffer between the copper canister and the granitic rock is not damaged, we can neglect the possibility of general corrosion damage being a threat to canister integrity over a 100,000 year storage period. However, if the bentonite buffer is damaged for any reason, and does not act as an engineered...
Innehållstyp: Publikationer -
2014:38 Technical Note, Detailed assessment of radionuclide Kd-values for the geosphere-main review phase
The Swedish Radiation Safety Authority (SSM) is reviewing an application submitted by the Swedish Nuclear Fuel and Waste Management Company (SKB) in 2011 to construct and operate a deep geologic repository for spent nuclear fuel at the Forsmark site in the municipality of Östhammar, Sweden. SKB has presented details of its long-term safety assessment, SR-Site, in a main report (SKB, 2011,...
Innehållstyp: Publikationer -
2014:33 Technical Note, Reproduction of SKB’s Canister Failure Calculations - What-If and ‘Residual’ Scenario to Illustrate Barrier Functions
The Swedish Nuclear Fuel and Waste Management Company (SKB) included analysis of a range of scenarios in its SR-Site report. SKB grouped these scenarios into two categories—main and residual. The main scenario included a likely scenario (corrosion failure) and a less probable scenario (seismicity-induced shear failure). The residual scenario included two unlikely scenarios—isostatic-load and...
Innehållstyp: Publikationer -
2014:17 Technical Note, Assessment of radiological effects on non-human biota –Main Review Phase
This report presents a review of SKBs assessment of the long-term radiological effects on plants and animals of a deep geological repository as described in SKB report TR-10-08. The SKB report is one of a number contributing to the overall safety assessment, referred to as SR-Site, for the repository. The conclusion of the SKB report was that the ‘study gives no reason to assume that any of...
Innehållstyp: Publikationer -
2014:23 Technical Note, Workshop on Rock Mechanics Issues and their Implications for Groundwater Flow – Main Review Phase
This report describes the outcome of the workshop organized by SSM on Rock Mechanics and Hydrogeology that was held in Stockholm on the 30/9 and 1/10, 2013. The report summarizes the issues discussed and extracts the essential viewpoints that have been expressed. It should not be considered as a comprehensive record of all the discussions at the workshop and individual statements made by...
Innehållstyp: Publikationer -
2014:22 Technical Note, Workshop on seismic hazard at Forsmark
This report describes the outcome of the workshop organized by SSM on seismic hazard at Forsmark that was held in Stockholm on the 4 and 5 of June, 2013. The report summarizes the issues discussed and extracts the essential viewpoints that have been expressed. It should not be considered as a comprehensive record of all the discussions at the workshop and individual statements made by...
Innehållstyp: Publikationer -
2014:41 Technical Note, Review of Radionuclide Abstraction and Selection in the SKB Safety Case -Main Review Phase
As part of the Swedish Radiation Safety Authority (SSM) review of the Swedish Nuclear Fuel and Waste Management Company (SKB) SR-Site safety assessment for a spent nuclear fuel repository in Sweden, this technical note documents the Center for Nuclear Waste Regulatory Analyses (CNWRA®) review of the abstraction and selection of radionuclides in the SKB safety case. Specifically, CNWRA...
Innehållstyp: Publikationer -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Innehållstyp: Publikationer -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
This technical note is part of a set of reviews for Swedish Radiation Safety Authority (SSM) by external experts to assist with the Initial Review Phase. The overall goal of the Initial Review Phase is for SSM to achieve a broad coverage of the information provided in SR-Site and its supporting references and in particular to identify where complementary information or clarifications need to...
Innehållstyp: Publikationer -
2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 1
-
2 (nuvarande sida)
- Sida: 3
- Sida: 4
- Sida: 5
- Sida: 6
- Sida: 7
- …
- Sida: 12
- Sida: 13
- Nästa sida