Din avgränsning ger 192 träffar.
-
2014:22 Technical Note, Workshop on seismic hazard at Forsmark
This report describes the outcome of the workshop organized by SSM on seismic hazard at Forsmark that was held in Stockholm on the 4 and 5 of June, 2013. The report summarizes the issues discussed and extracts the essential viewpoints that have been expressed. It should not be considered as a comprehensive record of all the discussions at the workshop and individual statements made by...
Innehållstyp: Publikationer -
2014:12 Granskning och utvärdering av SKB:sredovisning av Fud-program 2013
Enligt förordningen (1984:14) om kärnteknisk verksamhet (kärnteknikförordningen) ska Strålsäkerhetsmyndigheten (SSM) granska och utvärdera det program för forskning, utveckling och demonstration med mera (Fud-program) som reaktorinnehavarna enligt lagen (1984:3) om kärnteknisk verksamhet (kärntekniklagen) ska upprätta. Svensk Kärnbränslehantering...
Innehållstyp: Publikationer -
2012:67 Technical Note, Hydrogeological modelling of the Forsmark site
A modelling study has been conducted using discrete-fracture network (DFN) models in combination with discrete-feature hydrogeological modelling methods for representation of other potentially conductive features such as the disturbed zone around repository tunnels. The principal results consist of hydraulic and transport property estimates for discrete-fracture network (DFN) models on block...
Innehållstyp: Publikationer -
2013:35 Technical Note, Rock Mechanics – Confidence of SKB’s models for predicting the occurrence of a damage zone around the excavations – Main Review Phase
This assignment, performed at Southwest Research Institute, focusses on evaluating SKB’s assessment of potential occurrence of damaged rock zones (also referred to as excavation-damaged zone or EDZ) around underground excavations at the site. This report presents the authors’ evaluation of SKB’s assessment in the specific area based on questions raised by SSM. The evaluation includes...
Innehållstyp: Publikationer -
2013:16 Technical Note, Assessment of PWR fuel depletion and of neutron multiplication factors for intact PWR fuel copper canisters – main review phase
SKB (Svensk Kärnbränslehantering AB) in 2011 applied to the Swedish government for approval of a proposed solution for disposal of used fuel from Swedish nuclear power reactors and some relatively minor quantities of other fissile material. This Technical Note contains results of a recent review of the SKB methods used to determine the influence of reactor depletion on keff of intact...
Innehållstyp: Publikationer -
2012:65 Technical Note, Review of the Nuclear Criticality Safety of SKB’s Licensing Application for a Spent Nuclear Fuel Repository in Sweden
The Swedish Nuclear Fuel and Waste Management Company in 2011 applied to the Swedish government for approval of a proposed solution for disposal of used fuel from Swedish nuclear power reactors and some relatively minor quantities of other fissile material. This Technical Note contains results of a recent nuclear criticality safety review of the overall prospects of the application being able...
Innehållstyp: Publikationer -
2012:35 Technical Note, Review of SKB’s Code Documentation and QA for the SR-Site Safety Assessment
This initial review examined the Swedish Nuclear Fuel and Waste Management Company (SKB) code documentation and quality assurance, which is important to the safety assessment SR-Site because the computer codes used must be both suitable for the analyses performed and capable of producing accurate results for those analyses. SKB has prepared a report that summarizes the code documentation...
Innehållstyp: Publikationer -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Innehållstyp: Publikationer -
2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review
This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 1
-
2 (nuvarande sida)
- Sida: 3
- Sida: 4
- Sida: 5
- Sida: 6
- Sida: 7
- …
- Sida: 19
- Sida: 20
- Nästa sida