Din avgränsning ger 168 träffar.
-
2015:46 Assessment of data and criteria for cladding burst in loss-of-coolant accidents
Ali R. Massih, Lars Olof Jernkvist SSM English...
Innehållstyp: Publikationer -
2014:20 An evaluation of high-temperature creep of zirconium alloys: data versus models
In this report Dr Massih presents correlations for creep in different phases of zirconium alloys and also presents a general solution to the difficulty of accurately describing the material properties in phase transition for several zirconium alloys. Based upon superplasticity relations, models are adapted to fit with experimental data for materials in transition regions. The creep models are...
Innehållstyp: Publikationer -
2017:17 Granskning och utvärdering av SKB:s redovisning av Fud-program 2016
Strålsäkerhetsmyndighetens yttrande Svensk Kärnbränslehantering AB (SKB) har lämnat in Fud-program 2016 till Strålsäkerhetsmyndigheten (SSM) för granskning och utvärdering enligt 12 § lagen 1984:3) om kärnteknisk verksamhet kärntekniklagen). SSM föreslår att regeringen beslutar att reaktorinnehavarna genom SKB:s redovisning...
Innehållstyp: Publikationer -
2017:33 SSM’s external experts’ review of SKB’s safety assessment SR-PSU – dose assessment, Kd-values, and safety analysis methodology
Main review phase...
Innehållstyp: Publikationer -
2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper
The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...
Innehållstyp: Publikationer -
2012:35 Technical Note, Review of SKB’s Code Documentation and QA for the SR-Site Safety Assessment
This initial review examined the Swedish Nuclear Fuel and Waste Management Company (SKB) code documentation and quality assurance, which is important to the safety assessment SR-Site because the computer codes used must be both suitable for the analyses performed and capable of producing accurate results for those analyses. SKB has prepared a report that summarizes the code documentation...
Innehållstyp: Publikationer -
2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review
This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...
Innehållstyp: Publikationer -
2012:24 Technical Note, Initial Review of SR-Site Main Report
The Swedish Radiation Safety Authority (SSM) is reviewing a license application, which has been submitted by Svensk Kärnbränslehantering AB (SKB), for a repository for the final disposal of spent nuclear fuel. SKB’s Application includes an assessment of the long-term safety of the proposed repository. The assessment is known as SR-Site. This technical note records the findings from a...
Innehållstyp: Publikationer -
2012:29 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
De dokument i SR-Site som är relevanta till detta granskningsområde bedöms vara generellt i tillräckligt hög kvalitet för att utgöra underlagsmaterial för vidare granskning i huvudgranskningsfasen av SSM:s GLS- (granskning av långsiktig säkerhet) projekt. Behov av kompletterande information eller förtydliganden har dock identifierats inom...
Innehållstyp: Publikationer -
2012:26 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill - Chemical erosion processes
The SR-Site documentation relevant to this review topic was found to be of sufficiently high quality overall to justify further consideration in the Main Review Phase of SSM’s PCS (Post-closure safety) project. Several specific topics for which complementary information and clarifications should be requested from SKB were also identified (Appendix 2). Specific review topics for consideration...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 1
- Sida: 2
- Sida: 3
-
4 (nuvarande sida)
- Sida: 5
- Sida: 6
- Sida: 7
- …
- Sida: 16
- Sida: 17
- Nästa sida