Din avgränsning ger 275 träffar.
-
2015:22 Technical Note, Further modelling and sensitivity study using the GEMA-Site “alternative biosphere models” and review of material from SKB’s RFI response
Denna rapport har upprättats som en del av SSM:s huvudgranskning av SKB:s säkerhetsanalys av den långsiktiga säkerheten för KBS-3 (SR-Site), en geologisk slutförvarsanläggning, som SKB planerar uppföra i Forsmark. Granskningen tar upp de metoder som används för dosberäkningar i SR-Site, speciellt vad gäller transporter, ackumulering och...
Innehållstyp: Publikationer -
2016:05 Technical Note, Assessment of SKB TR-14-15 Assessment of SKB TR-14-15 “Possible influence from stray currents from high voltage DC power transmission on copper canisters”
The general objective of the present project is to provide independent review comments for one area of SKB:s post closure safety analysis, SR-Site. With this in mind, the purpose of this report is to review SKB’s presentation on possible influence from stray currents from high voltage DC power transmission on a repository for nuclear fuel. Laust B Pedersen SSM English The general objective of...
Innehållstyp: Publikationer -
2015:40 Technical Note, Assessment of flow-related transport parameters used in the SR-Site safety case
Joel E. Geier SSM English...
Innehållstyp: Publikationer -
2015:41 Technical Note, Hydrogeological aspects of future human actions for a repository at Forsmark
Joel E. Geier SSM English...
Innehållstyp: Publikationer -
2015:45 Technical Note, Parallel assessment of effects on non-human biota using RESRAD-BIOTA
Karolina Stark SSM English...
Innehållstyp: Publikationer -
2014:38 Technical Note, Detailed assessment of radionuclide Kd-values for the geosphere-main review phase
The Swedish Radiation Safety Authority (SSM) is reviewing an application submitted by the Swedish Nuclear Fuel and Waste Management Company (SKB) in 2011 to construct and operate a deep geologic repository for spent nuclear fuel at the Forsmark site in the municipality of Östhammar, Sweden. SKB has presented details of its long-term safety assessment, SR-Site, in a main report (SKB, 2011,...
Innehållstyp: Publikationer -
2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper
The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...
Innehållstyp: Publikationer -
2012:35 Technical Note, Review of SKB’s Code Documentation and QA for the SR-Site Safety Assessment
This initial review examined the Swedish Nuclear Fuel and Waste Management Company (SKB) code documentation and quality assurance, which is important to the safety assessment SR-Site because the computer codes used must be both suitable for the analyses performed and capable of producing accurate results for those analyses. SKB has prepared a report that summarizes the code documentation...
Innehållstyp: Publikationer -
2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review
This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer