Din avgränsning ger 411 träffar.
-
2004:12 Transparency, Citizen Participation, Organisations and Roles (pdf 1.66 MB)
1696 kB ... Scientist, SKi SKB Ski, SSI Swedish Nuclear Waste Management System Ministries, Parliament Min. Res, ANDRA, CEA, IPSN, GPD, CNE, OPECST DSIN (DIN) OPRI Standards for w aste separation, conditioning...
Innehållstyp: Dokument -
2022:15 Strukturer och ledarskap för organisatorisk funktionalitet som främjar säkerheten genom ett kärnkraftverks olika faser och övergångarna däremellan
1682 kB ... fokus upplevs som viktigt för att hantera olika interna och externa utmaningar och där är ekono- min en utmaning då det krävs en resursansträngning i samband med ett skifte i fokus. Andra större utmaningar...
Innehållstyp: Dokument -
2016:14 Radiological examinations of children: a study of method options
1328 kB ... percentage of assessed justification is shown by region (Figures 11, 12). Waiting time Days Min 0 Max (e.g. planned checkups) 767 Average 23 Median 4 SSM 2016:14 38 Figure 11. The reviewers’...
Innehållstyp: Dokument -
2015:26 Radiologiska undersökningar av barn – en studie av metodval
1804 kB ... 127 6,9% Huvud hals 64 3,5% 63 3,4% Diverse 31 1,7% 31 1,7% Thorax 9 0,5% 10 0,5% Remiss Utförd Min 0 Max (Ex. planerad kontroll) 767 Medlvärde 23 Median 4 Väntetid, dagar SSM 2015:26 29 Antalet...
Innehållstyp: Dokument -
00:42 Study of Defect Characteristics Essential for NDT Testing Methods ET, UT and RT
1522 kB ... detectabilty either accurate or slightly pessimistic. 40(50) 10 0,01 0,001 0.001 0,01 Min for 2 J\"",~\ 'M . .... ,+ • .1 EV, 1 NO • 1 BV, 1 • • 1'0 .2 NOs Figure 41,'...
Innehållstyp: Dokument -
2017:23 Kalibrering för bestämning av optimal beräkningsmodell
2678 kB ... mixing section 10,000 – 60,000 1. Grid d = 1, w = 4 @ x = -520 Volumetric flow rate 15 – 90 l/min 2. Grid d = 1, w = 4 @ x = -300 Density difference 0 – 10% 3. Grid d = 0.4, w = 1.25 @ x = -80...
Innehållstyp: Dokument -
2004:51 Investigation of the Potential for In-Vessel Melt Retention in the Lower Head of a BWR by Cooling through the Control Rod Guide Tubes
1437 kB ... was switched on. The power input to the bed was increased in small steps. Delays of at least 1.5 min were necessary, after a power step, to make reasonable power measurements. Near the expected dryout...
Innehållstyp: Dokument -
Questions posed to Sweden.pdf
222 kB ... of the collected water on downstream side of the plug: • Water pressure [MPa] • Leakage [liter/min] The initial plan for the experiment was to pressurize to 7 MPa of water pressure behind the plug...
Innehållstyp: Dokument -
2003:08 Research and Development Program in Reactor Diagnostics and Monitoring with Neutron Noise Methods
2625 kB ... PQPŦKOR .24/Ŧ KORCEVKPI Fig. 18. Standard deviation vs High-pass frequency linear region min Fc j \ F0– j Fa Fc a '-----------= VWN std H P f S > @= thr VWN 2 Nlog= V i 0 if V i thr...
Innehållstyp: Dokument -
02:49 Haverihantering, en sammanställning och värdering av kunskapsläget om haverifenomen och haverihantering
353 kB ... med vatten från wet well. Detta system, som består av två redundanta stråk, aktiveras automatiskt 30 min. efter I- isolering. Systemet kan också manövreras från det centrala kontrollrummet och från lokala...
Innehållstyp: Dokument
Gå till sida:
- Föregående sida
- Sida: 1
- Sida: 2
- …
- Sida: 37
- Sida: 38
- Sida: 39
-
40 (nuvarande sida)
- Sida: 41
- Sida: 42
- Nästa sida