Visar 476 sökträffar på ”Min soltid”
-
2016:08 SSM’s external experts’ reviews of SKB’s safety assessment SR-PSU – hydrogeological and chemical aspects
3289 kB ... early stages (for example relating to tunnel wall exposures and drainage engineering). Finally, a min...
Innehållstyp: Dokument -
2012:14 Rapport från SSM:s vetenskapliga råd om ultraviolett strålning 2011
1292 kB ... Martschin C, Wiegleb-Edström D, Wiklund K. Previous extensive sun exposure and subsequent vita- min D production in patients with basal cell carcinoma of the skin, SSM 2012:14 24 has no protective...
Innehållstyp: Dokument -
2012:02 Evaluation of activity build-up experiments
1851 kB ... monitored by their weight injected. From the weight loss of the prepared solution a dosage flow (ml/min) was calculated. This was done since the pumps (HPLC) could be unstable 1 . In Figure 3 the injection...
Innehållstyp: Dokument -
2011:27 Riskanalyser inom extern strålbehandling
1805 kB ... behandlingen med både bild och ljud och kan kom- municera med patienten. Behandlingen tar i snitt ca 15-20 min. Per- sonalen kan avbryta behandlingen om patienten ger tecken (vinkar eller säger till). Personalen...
Innehållstyp: Dokument -
2004:12 Transparency, Citizen Participation, Organisations and Roles (pdf 1.66 MB)
1696 kB ... Scientist, SKi SKB Ski, SSI Swedish Nuclear Waste Management System Ministries, Parliament Min. Res, ANDRA, CEA, IPSN, GPD, CNE, OPECST DSIN (DIN) OPRI Standards for w aste separation, conditioning...
Innehållstyp: Dokument -
Kapitel 8 – Säkerhetsanalys.pdf
3392 kB ... The compositions are shown in table 2, 3 and 4. Table 2 – SS 140717 Material C Si Mn P S Ni Mg Min (%) 3.2 1.5 0.05 - - 0 0.02 Max (%) 4 2.8 1 0.08 0.02 2 0.08 Fe-content 90.02 - 95.13% (balance)...
Innehållstyp: Dokument -
Metodik för miljökonsekvensbedömning.pdf
773 kB ... stycken objekt av kalkgölar och rikkärrsmiljöer) besöktes. Under en viss bestämd tidsrymd, cirka 30 min per lokal, genomsöktes lokalen okulärt samt via lufthåvning. Samtliga förekommande arter registrerades...
Innehållstyp: Dokument -
2004:26 Engineered Barrier System - Manufacturing, Testing and Quality Assurance (pdf 324 kB)
324 kB ... criteria have not been developed yet. An upper limit of the inflow 18 rate (less than 10 l/min) has been suggested (Andersson et al., 2000), but there is no information about the necessity or relevance...
Innehållstyp: Dokument -
2003:26 Structure for Transparency in Nuclear Waste Management (pdf 319 kB)
319 kB ... that social and environmental issues have in policy processes. Ministries, Parliament Min. Res, ANDRA, CEA, IPSN, GPD, CNE, OPECST DSIN (DIN) OPRI Standards for w aste separation, conditioning...
Innehållstyp: Dokument -
2004:51 Investigation of the Potential for In-Vessel Melt Retention in the Lower Head of a BWR by Cooling through the Control Rod Guide Tubes
1437 kB ... was switched on. The power input to the bed was increased in small steps. Delays of at least 1.5 min were necessary, after a power step, to make reasonable power measurements. Near the expected dryout...
Innehållstyp: Dokument
Gå till sida:
- Föregående sida
- Sida: 1
- Sida: 2
- …
- Sida: 43
- Sida: 44
- Sida: 45
-
46 (nuvarande sida)
- Sida: 47
- Sida: 48
- Nästa sida