Din avgränsning ger 1334 träffar.
-
96:77 Common Cause Failure Analysis of Hydraulic Scram and Control Rod Systems in the Swedish and Finnish BWR Plants
Tuomas Mankamo SKI English...
Innehållstyp: Publikationer -
96:63 Riskanalys i MTO-perspektiv summering av metoder för industriell tillämpning
L. Harms-Ringdahl SKI Svenska...
Innehållstyp: Publikationer -
95:67 Analysis Tools for Reliability Databases
J. Dorrepaal SKI English...
Innehållstyp: Publikationer -
2012:18 Technical Note, SR-Site Independent Modelling of Engineered Barrier Evolution and Coupled THMC: Contribution to the Initial Review Phase
This review has focussed mainly on the modelling of the Engineered Barrier System (EBS) evolution, which includes coupled thermal, hydraulic, mechanical and chemical (THMC) processes. Additionally, the role of the EBS in the wider safety case was reviewed, including its treatment in scenarios and its representation in conceptual models since this provided the motivation for the modelling work...
Innehållstyp: Publikationer -
2010:41 Rock-block configuration in Uppland and the Ålands-hav basin, the regional surroundings of the SKB site in Forsmark, Sea and land areas, eastern Sweden
This report concerns a study which was initially conducted for the Swedish Nuclear Power Inspectorate (SKI), which is now merged into the Swedish Radiation Safety Authority (SSM). The conclusions and viewpoints presented in the report are those of the authors and do not necessarily coincide with those of the SSM. The topography in Uppland is more broken in the sea area east and northeast of...
Innehållstyp: Publikationer -
2014:10 Technical Note, Rock Mechanics - Confidence of SKB’s models for predicting the occurrence of spalling – Main Review Phase
This review study is placed in the context of SSM’s Main Review Phase for SKB’s safety assessment SR-Site. The assignment is titled “Rock Mechanics – Confidence of SKB’s models for predicting the occurrence of spalling”. The report presents the authors’ assessment in response to the questions raised by SSM. The review concentrated on two main issues: (1) the analysis of the assumptions made...
Innehållstyp: Publikationer -
2014:29 Technical Note, Independent Modelling of Radionuclide Transport, Evaluation of Colloid Transport Modelling – Main Review Phase
SKB excludes consideration of colloids originating inside the canister in its performance assessment on the basis of the filtration capability of the buffer material. In the canister failure by corrosion scenario (central corrosion case), the buffer material is assumed eroded, and the filtration argument is not entirely valid for excluding modelling in-canister colloids. In this Technical...
Innehållstyp: Publikationer -
2012:25 Workshop on Seismology
This report summarizes the issues discussed at the workshop and extracts the essential viewpoints that have been expressed. The report is not to consider as a comprehensive record of all the discussions at the workshop and individual statements made by workshop participants should be regarded as opinions rather than proven facts. This report includes, apart from the workshop synthesis, the...
Innehållstyp: Publikationer -
2012:28 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
This report consists of a Technical Note in SSM’s initial review phase of SKB’s safety analysis SR-Site. The aim of the initial review of issues concerning geochemical processes in buffer and backfill in a final repository is to make a broad illustration and review of SR-Site together with its subordinate references, as well as to identify potential needs for complementary information or...
Innehållstyp: Publikationer -
2004:24 Public Values and Stakeholder Involvement - A New Framework for Performance Assessment
A Report from the RISCOM II Project...
Innehållstyp: Publikationer