Din avgränsning ger 1352 träffar.
-
2012:42 Technical Note, Initial review of physical properties and processes of the buffer and backfill – Installation and initial state
The technical note briefly summarises the proposed designs and functions of the buffer and backfill, and examines SKB’s progress in manufacturing, installing and testing its proposed solutions. In brief, the review suggests that there are some procedural and practical engineering aspects (e.g., quality assurance procedures, backfilling rates) and several physical processes to do with the...
Innehållstyp: Publikationer -
2012:29 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
De dokument i SR-Site som är relevanta till detta granskningsområde bedöms vara generellt i tillräckligt hög kvalitet för att utgöra underlagsmaterial för vidare granskning i huvudgranskningsfasen av SSM:s GLS- (granskning av långsiktig säkerhet) projekt. Behov av kompletterande information eller förtydliganden har dock identifierats inom...
Innehållstyp: Publikationer -
2012:26 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill - Chemical erosion processes
The SR-Site documentation relevant to this review topic was found to be of sufficiently high quality overall to justify further consideration in the Main Review Phase of SSM’s PCS (Post-closure safety) project. Several specific topics for which complementary information and clarifications should be requested from SKB were also identified (Appendix 2). Specific review topics for consideration...
Innehållstyp: Publikationer -
2007:09 DECOVALEX-THMC - Task C
This report describes the results of Task C1 of the international DECOVALEX– THMC project devoted to Excavation Damage Zone (EDZ) in argillaceous rock at the Tournemire site in France. Task C of the project is aimed to understand the physical phenomena induced by excavation in the argillaceous rock. The task is to develop adequate numerical models for interpretation of observed damaged zones...
Innehållstyp: Publikationer -
2007:07 DECOVALEX-THMC Project - Task A
This report presents the definition of the first phase, Task A-1, of the Task A of the international DECOVALEX project. The task is a working example of how interaction between THMC modelling and SA analysis could be performed. Starting with the technical definition of the Task A, the report presents the results of preliminary THM calculations with a purpose of an initial appreciation of the...
Innehållstyp: Publikationer -
2007:10 DECOVALEX-THMC - Task D
The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The name DECOVALEX stands for DEvelopment of COupled models and their VALidation against Experiments. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on...
Innehållstyp: Publikationer -
2007:21 On tentative decommissioning cost analysis with specific authentic cost calculations with the application of the Omega code on a case linked to the Intermediate storage facility for spent fuel in Sweden
The aim of this applied study has been to demonstrate how a cost calculation is done in a systematic way. The framework of the project has been limited to older nuclear installations in Sweden. Furthermore, it may be envisaged that the process of making regular estimates of all the parameters is crucial in preparatory phases of decommissioning and dismantling processes. A secondary aim of the...
Innehållstyp: Publikationer -
2007:03 Variability and Uncertainties of Key Hydrochemical Parameters for SKB Sites
An important part of the site investigations conducted by the Swedish Nuclear Fuel and Waste Management Company (SKB) is the characterisation of groundwater chemical conditions in the deep bedrock environment where a final repository for spent nuclear fuel is planned to be located. This work is currently in its final stages at the two candidate sites, Forsmark and Laxemar, and should be...
Innehållstyp: Publikationer -
2007:02 Stakeholder involvement in Swedish nuclear waste management
This report have attempted to show the development of stakeholder involvement in the siting of a final repository for Sweden’s spent nuclear fuel as resembling something other than a straightforward linear process of improvement and refinement. Stakeholder involvement has developed, over the past 15 years or so, in something more like a patchwork of different shapes and forms. Some of the...
Innehållstyp: Publikationer -
2005:30 BENCHPAR PROJECT How to Incorporate Thermal-Hydro-Mechanical Coupled Processes into Performance Assessments and Design Studies for Radioactive Waste Disposal in Geological Formations
O. Stephansson, J.A. Hudson, J. Andersson SKI English...
Innehållstyp: Publikationer