Din avgränsning ger 5 träffar.
-
99:10 Verification and Validation of HumanFactors Issues in Control RoomDesign and Upgrades
Systems, facilities and equipment are periodically updated during a power plant's lifetime. This has human factors implications, especially if the central control room is involved. Human factors work may therefore be required. There is an extensive literature on human factors itself, but not so much on how it is verified and validated. Therefore, HRP and the Swedish Nuclear Power Inspectorate...
Innehållstyp: Publikationer -
1999:13 Determination of the Neutron and Photon Dose Equivalent at Work Places in Nuclear Facilities of Sweden
Various mixed neutron-photon fields at workplaccs in the containment of pressurised water reactors and in the vicinity of transport containers with spent fuel elements were investigated with spectrometers and dosimeters.The spectral neutron fluences evaluated from measurements with multisphere systems were recommended to be used for the calculation of dosimetric reference values for...
Innehållstyp: Publikationer -
99:55 Risk Based Test Interval and Maintenance Optimisation Application and Uses
Erik Sparre SKI English...
Innehållstyp: Publikationer -
99:08 Human Factors Aspects of Non-Destructive Testing in the Nuclear Power Context
J. Enkvist, A. Edland, O. Svenson SKI English...
Innehållstyp: Publikationer -
99:34 APRI 3 - Accident Phenomena of Risk Importance
Final report...
Innehållstyp: Publikationer
Gå till sida:
-
1 (nuvarande sida)