99:10 Verification and Validation of HumanFactors Issues in Control RoomDesign and Upgrades

Systems, facilities and equipment are periodically updated during a power plant's lifetime. This has human factors implications, especially if the central control room is involved. Human factors work may therefore be required. There is an extensive literature on human factors itself, but not so much on how it is verified and validated. Therefore, HRP and the Swedish Nuclear Power Inspectorate (SKI) commissioned a study.

The objective was to review the literature and establish a knowledge base on verification and validation (V &V) of human factors issues. The report first discusses verification and validation as applied to human factors work. It describes a design process and the typical human factors topics involved. It then presents a generic method for V &V of human factors. This is built on a review of standards, guidelines and other references given in an annotated bibliography. The method is illustrated by application to some human factors topics.