Din avgränsning ger 55 träffar.
-
2007:19 An Applied Study of Implementation of the Advanced Decommissioning Costing Methodology for Intermediate Storage Facility for Spent Fuel in Studsvik, Sweden with special emphasis to the application of the Omega code
The aim of this applied study has been to describe in a systematic way an appropriate methodological sequence for cost estimation of crucial parameters in decontamination and decommission processes. The work has been limited to older nuclear installations and facilities. Furthermore, it may be envisaged that the process of estimating the parameters of decommissioning is one of the main issues...
Innehållstyp: Publikationer -
2007:08 DECOVALEX-THMC - Task B
This report summarizes the work contributed to Phase 2 of Task B of the international DECOVALEX-THMC project, which took place during the period of March 2004 to May 2006. The Phase 2 work incorporated the use of a wide range of numerical models to simulate the failure of a number of intact rock core samples, from the APSE tunnel at Äspö HRL, as tested in uniaxial compression and other...
Innehållstyp: Publikationer -
2007:11 Review of Quality Assurance in SKBs Repository Research Experiments
SKB is preparing a license application for the construction of a final repository for spent nuclear fuel in Sweden. This application will be supported by the safety assessment SR-Site for the post-closure phase. As a preparation for SR-Site SKB has recently produced the SRCan safety assessment, which is currently in review. The assessment of long-term safety is based on a broad range of...
Innehållstyp: Publikationer -
2007:35 Urananrikning med laser och plasmaseparation - en analys med fokus på exportkontroll
Den nu resulterande rapporten berör kortfattat några generella principer för laseranrikning, både separation av atomärt uran – AVLIS - och separation av uran i molekylär form – MLIS. Vidare berörs mycket översiktligt några andra metoder inklusive plasmaseparation. Dessutom nämns vilken utrustning som kan komma ifråga, indikatorer på laseranrikning,...
Innehållstyp: Publikationer -
2007:04 Link Between RI-ISI and Inspection Qualification: Relationship between Defect Detection Rate and Margin of Detection
A relationship has been established between defect detection ratio and margin of detection based on blind trails. The results are based on a rather small amount of data produced by personnel from one inspection laboratory but give us indications of how signal to noise ratio is possible to relate to the probability of detection (POD) used in RI-ISI models. The relationship need to be developed...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 3
- Sida: 4
- Sida: 5
-
6 (nuvarande sida)