Din avgränsning ger 184 träffar.
-
2012:67 Technical Note, Hydrogeological modelling of the Forsmark site
A modelling study has been conducted using discrete-fracture network (DFN) models in combination with discrete-feature hydrogeological modelling methods for representation of other potentially conductive features such as the disturbed zone around repository tunnels. The principal results consist of hydraulic and transport property estimates for discrete-fracture network (DFN) models on block...
Innehållstyp: Publikationer -
2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Innehållstyp: Publikationer -
2013:16 Technical Note, Assessment of PWR fuel depletion and of neutron multiplication factors for intact PWR fuel copper canisters – main review phase
SKB (Svensk Kärnbränslehantering AB) in 2011 applied to the Swedish government for approval of a proposed solution for disposal of used fuel from Swedish nuclear power reactors and some relatively minor quantities of other fissile material. This Technical Note contains results of a recent review of the SKB methods used to determine the influence of reactor depletion on keff of intact...
Innehållstyp: Publikationer -
2012:65 Technical Note, Review of the Nuclear Criticality Safety of SKB’s Licensing Application for a Spent Nuclear Fuel Repository in Sweden
The Swedish Nuclear Fuel and Waste Management Company in 2011 applied to the Swedish government for approval of a proposed solution for disposal of used fuel from Swedish nuclear power reactors and some relatively minor quantities of other fissile material. This Technical Note contains results of a recent nuclear criticality safety review of the overall prospects of the application being able...
Innehållstyp: Publikationer -
2012:61 Geochemical Constraints on Buffer Pore Water Evolution and Implications for Erosion
Mineralogical data from the Forsmark Site show that smectite and calcite occur at all depths in Forsmark fractures, with no evidence for removal/dissolution by previous glacial episodes. This natural analogue information implies that these minerals may not have been eroded/dissolved during previous glacial episodes. Available thermodynamic data suggest that repository-depth Forsmark...
Innehållstyp: Publikationer -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Innehållstyp: Publikationer -
2012:43 Technical Note, Literature review of groundwater flow in permafrost
The Swedish Radiation Safety Authority (SSM) assigned the task of compiling the state of the knowledge with respect to groundwater flow in permafrost conditions. In particular, the study was to consider whether (i) the main processes related to groundwater flow in permafrost were understood, (ii) appropriate field data was available, and (iii) current models appropriately represent the...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer -
2011:34 Evolution of hydrogen by copper in ultrapure water without dissolved oxygen
One result from this research was that the experimental difficulties of repeating Hultqvist and co-workers work are considerable and were initially underestimated. The main challenge was to obtain satisfactory tightness of all connectors involved in the experimental set-up. The problems with leakage resulted in that the research program originally planned for in this project had to be reduced...
Innehållstyp: Publikationer -
2011:31 Allocation of Decommissioning and Waste Liabilities
A crucial task for the present generations is to ensure that environmental liabilities are identified sufficiently well so that it may be possible to accumulate the corresponding necessary financial assets in the Swedish Nuclear Waste Fund. Adequate funding will provide forthcoming generation’s with the financial means to decommission and dismantle older nuclear facilities that are part of...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 1
- Sida: 2
- Sida: 3
-
4 (nuvarande sida)
- Sida: 5
- Sida: 6
- Sida: 7
- …
- Sida: 18
- Sida: 19
- Nästa sida