Din avgränsning ger 233 träffar.
-
2014:22 Technical Note, Workshop on seismic hazard at Forsmark
This report describes the outcome of the workshop organized by SSM on seismic hazard at Forsmark that was held in Stockholm on the 4 and 5 of June, 2013. The report summarizes the issues discussed and extracts the essential viewpoints that have been expressed. It should not be considered as a comprehensive record of all the discussions at the workshop and individual statements made by...
Innehållstyp: Publikationer -
2014:41 Technical Note, Review of Radionuclide Abstraction and Selection in the SKB Safety Case -Main Review Phase
As part of the Swedish Radiation Safety Authority (SSM) review of the Swedish Nuclear Fuel and Waste Management Company (SKB) SR-Site safety assessment for a spent nuclear fuel repository in Sweden, this technical note documents the Center for Nuclear Waste Regulatory Analyses (CNWRA®) review of the abstraction and selection of radionuclides in the SKB safety case. Specifically, CNWRA...
Innehållstyp: Publikationer -
2018:21 Research on Resaturation of Bentonite Buffer
Background Resaturation processes in the bentonite buffer in a KBS-3 type repository for spent nuclear fuel are complicated and are often illustrated, analysed and modelled multi-disciplinarily as coupled thermal (T), hydrological (H) and mechanical (M) processes with multi-phase flow, elastoplastic evolution in a swelling porous medium. Previous THM-modelling showed that the re-saturation...
Innehållstyp: Publikationer -
2018:05 Clab och inkapslingsanläggningen (Clink)
Beredning inför regeringens prövning Slutförvaring av använt kärnbränsle...
Innehållstyp: Publikationer -
Kompletteringar (SFR)
Här listas de kompletteringar som SKB gjort till ansökan enligt kärntekniklagen, daterad 19 december 2014, indelade per tillfälle då de skickades in.
Innehållstyp: Artiklar -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Innehållstyp: Publikationer -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
This technical note is part of a set of reviews for Swedish Radiation Safety Authority (SSM) by external experts to assist with the Initial Review Phase. The overall goal of the Initial Review Phase is for SSM to achieve a broad coverage of the information provided in SR-Site and its supporting references and in particular to identify where complementary information or clarifications need to...
Innehållstyp: Publikationer -
2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Innehållstyp: Publikationer -
2012:61 Geochemical Constraints on Buffer Pore Water Evolution and Implications for Erosion
Mineralogical data from the Forsmark Site show that smectite and calcite occur at all depths in Forsmark fractures, with no evidence for removal/dissolution by previous glacial episodes. This natural analogue information implies that these minerals may not have been eroded/dissolved during previous glacial episodes. Available thermodynamic data suggest that repository-depth Forsmark...
Innehållstyp: Publikationer -
1997:05 SKI SITE-94
The Swedish Industry program for deep geological disposal of spent nuclear fuel and high-level radioactive waste is now in the early stages of the site selection process, with feasibility studies underway in 5 to 10 municipalities. According to the Swedish Nuclear Fuel and Waste Management Co., SKB (SKB RD&D Programme, 1995), the ongoing siting process involves selection of two sites for...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 1
- Sida: 2
-
3 (nuvarande sida)
- Sida: 4
- Sida: 5
- Sida: 6
- Sida: 7
- …
- Sida: 23
- Sida: 24
- Nästa sida