Sök

Din avgränsning ger 278 träffar.

Sortera på:

Relevans Datum
  • 2010:24 On Cost Estimate for Decommissioning of one Isotope Central

    The present generation has the responsibility to ensure and guarantee that sufficient financial resources are accrued into the Swedish Nuclear Waste Fund to cover all future costs. Thus, the next generation, as well as any succeeding generations, will have the financial resources required in order to undertake the necessary measures, in an appropriate manner, for the decommissioning and...

    Innehållstyp: Publikationer
  • 2010:33 Lineament interpretation Short review and methodology

    This report concerns a study which was initially conducted for the Swedish Nuclear Power Inspectorate (SKI), which is now merged into the Swedish Radiation Safety Authority (SSM). The conclusions and viewpoints presented in the report are those of the author and do not necessarily coincide with those of the SSM. In the characterization of a site that may have potential for hosting a...

    Innehållstyp: Publikationer
  • 2010:28 GEMA3D – landscape modelling for dose assessments

    Post-closure safety assessments for nuclear waste repositories involve radioecological modelling for an underground source term. Following several decades of research and development, the Swedish Nuclear Waste Management Company (SKB) is approaching a phase of license application. According to SKB’s plans, an application to construct a geological repository will be submitted by the end of...

    Innehållstyp: Publikationer
  • 2010:31 Buffer erosion: An overview of concepts and potential safety consequences

    In its safety analysis SR-Can, SKB reported preliminary results and conclusions on the mechanisms of bentonite colloid formation and stability, with a rough estimate of the consequences of loss of bentonite buffer by erosion. With the review of SR-Can the authorities (SKI and SSI) commented that erosion of the buffer had the greatest safety significance, that the understanding of the...

    Innehållstyp: Publikationer
  • 2010:30 INSITE Summary Report

    SSM and its predecessor SKI employed a team of earth scientists who followed and reviewed SKB’s investigations of the potential spent nuclear fuel repository sites at Forsmark and Laxemar. This group was named INSITE (INdependent Site Investigation Tracking and Evaluation) and began its work in 2002 and completed its task with the review of the final versions SKB’s site descriptive models,...

    Innehållstyp: Publikationer
  • 1999:51 Kostnadsberäkning av diupförvaringav det använda kärnbränslet

    Enligt finansieringslagen skall kärnkraftföretagen, i praktiken Svensk Kärnbränslehantering AB (SKB), årligen till Statens kärnkraftinspektion (SKI) lämna en beräkning över kostnaderna för att omhänderta det använda kärnbränslet och för avvecklingen och rivningen av kärnkraftverken. Efter att SKI granskat och värderat...

    Innehållstyp: Publikationer
  • 2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review

    This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...

    Innehållstyp: Publikationer
  • 2012:43 Technical Note, Literature review of groundwater flow in permafrost

    The Swedish Radiation Safety Authority (SSM) assigned the task of compiling the state of the knowledge with respect to groundwater flow in permafrost conditions. In particular, the study was to consider whether (i) the main processes related to groundwater flow in permafrost were understood, (ii) appropriate field data was available, and (iii) current models appropriately represent the...

    Innehållstyp: Publikationer
  • 2012:17 Technical Note, Corrosion of copper canister

    It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...

    Innehållstyp: Publikationer
  • 2011:09 Is Copper Immune to Corrosion When in Contact With Water and Aqueous Solutions?

    The KBS-3concept implies that spent nuclear fuel is placed in copper canisters surrounded by clay and finally placed approximately 500 m down from surface into granitic bedrock, in order to isolate the spent nuclear fuel from humans and environment for very long time scales (i.e. millions of years). The concept is based on the multi-barrier principle, in this respect the barriers are the...

    Innehållstyp: Publikationer