Din avgränsning ger 378 träffar.
-
2010:24 On Cost Estimate for Decommissioning of one Isotope Central
The present generation has the responsibility to ensure and guarantee that sufficient financial resources are accrued into the Swedish Nuclear Waste Fund to cover all future costs. Thus, the next generation, as well as any succeeding generations, will have the financial resources required in order to undertake the necessary measures, in an appropriate manner, for the decommissioning and...
Innehållstyp: Publikationer -
2009:19 Review of SKB’s Quality Assurance Programme
SKB is preparing a license application for the construction of a final repository for spent nuclear fuel in Sweden. This application will be supported by the safety assessment SR-Site for the post-closure phase. The assessment of long-term safety is based on a broad range of experimental results from laboratory scale, intermediate scale and up to full scale experiments. It is essential that...
Innehållstyp: Publikationer -
2009:28 Biogeochemistry of Redox at Repository Depth and Implications for the Canister
The present groundwater chemical conditions at the candidate sites for a spent nuclear fuel repository in Sweden (the Forsmark and Laxemar sites) and processes affecting its future evolution comprise essential conditions for the evaluation of barrier performance and long-term safety. This report reviews available chemical sampling information from the site investigations at the candidate...
Innehållstyp: Publikationer -
2010:05 Discrete-Feature Model Implementation of SDM-Site Forsmark
SSM has been following the investigations of the two candidate sites for a repository for spent nuclear fuel that the Swedish Nuclear Fuel and Waste Management Company (SKB) have been undertaking. SKB has reported the results of the investigations as site descriptive models. These models will be used to underpin the safety analysis following the license application of the repository planned...
Innehållstyp: Publikationer -
2010:18 Radionuclide Transport: Preparation During 2009 for the SR-Site Review
Post-closure safety assessments for nuclear waste repositories involve radioecological modelling for an underground source term. Following several decades of research and development, the Swedish Nuclear Waste Management Company (SKB) is approaching a phase of license application. According to SKB’s plans, an application to construct a geological repository will be submitted by the end of...
Innehållstyp: Publikationer -
2009:35 Evaluation of SKB/Posiva’s report on the horizontal alternative of the KBS-3 method
The KBS-3 method, based on multiple barriers, is the proposed spent fuel disposal method both in Sweden and Finland. The method has two design alternatives: the vertical (KBS-3V) and the horizontal (KBS-3H). SKB and Posiva have conducted a joint research, development and demonstration (RD&D) programme in 2002-2007 with the overall aim of establishing whether the KBS-3H represents a...
Innehållstyp: Publikationer -
2009:09 Analysis of three sets of SWIW tracer test data using a two-population complex fracture model for matrix diffusion and sorption
For the non-sorbing tracer uranine, both the finite and the semi-infinite populations play a distinct role in controlling BTC. For the sorbing tracers Cs and Rb the finite population does not saturate, but acts essentially semi-infinite, thus the BTC behaviour is comparable to that obtained for a model containing only a semi-infinite rock matrix. The ability to match BTC for both sorbing and...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer -
2011:09 Is Copper Immune to Corrosion When in Contact With Water and Aqueous Solutions?
The KBS-3concept implies that spent nuclear fuel is placed in copper canisters surrounded by clay and finally placed approximately 500 m down from surface into granitic bedrock, in order to isolate the spent nuclear fuel from humans and environment for very long time scales (i.e. millions of years). The concept is based on the multi-barrier principle, in this respect the barriers are the...
Innehållstyp: Publikationer -
2012:24 Technical Note, Initial Review of SR-Site Main Report
The Swedish Radiation Safety Authority (SSM) is reviewing a license application, which has been submitted by Svensk Kärnbränslehantering AB (SKB), for a repository for the final disposal of spent nuclear fuel. SKB’s Application includes an assessment of the long-term safety of the proposed repository. The assessment is known as SR-Site. This technical note records the findings from a...
Innehållstyp: Publikationer