Din avgränsning ger 47 träffar.
-
2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper
The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer -
2012:13 Technical Note, A review of the creep ductility of copper for nuclear waste canister application
SKB has presented insufficient evidence to justify their position that the OFP copper has an adequate creep ductility during long term storage. Their large body of experiments only serves to prove that the creep ductility is sufficient for much shorter time spans than the intended storage times. There is a clear need for a credible theory of creep brittleness of OFP copper which will permit...
Innehållstyp: Publikationer -
2012:10 Technical Note, Review of the Geomicrobiological Aspects of SKB’s Licence Application for a Spent Nuclear Fuel Repository in Forsmark, Sweden
The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...
Innehållstyp: Publikationer -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Innehållstyp: Publikationer -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
This technical note is part of a set of reviews for Swedish Radiation Safety Authority (SSM) by external experts to assist with the Initial Review Phase. The overall goal of the Initial Review Phase is for SSM to achieve a broad coverage of the information provided in SR-Site and its supporting references and in particular to identify where complementary information or clarifications need to...
Innehållstyp: Publikationer -
2012:67 Technical Note, Hydrogeological modelling of the Forsmark site
A modelling study has been conducted using discrete-fracture network (DFN) models in combination with discrete-feature hydrogeological modelling methods for representation of other potentially conductive features such as the disturbed zone around repository tunnels. The principal results consist of hydraulic and transport property estimates for discrete-fracture network (DFN) models on block...
Innehållstyp: Publikationer -
2012:52 Technical Note, Shear movement of near-field rock due to large earthquakes
The review assignment concentrates on the possible impact of large earthquakes on the shear deformation of large fractures in the repository volume. For this purpose a general review of some of SKB‘s top-level reports was carried out. The reports draw a generally consistent and to a considerable extend comprehensive picture of the potential impact on the repository integrity in case of the...
Innehållstyp: Publikationer -
2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Innehållstyp: Publikationer -
2012:49 Hydrogeological characteristics of sites for low- and intermediate-level waste disposal
The Forsmark area with its selected two sites and the Laxemar-Simpevarp area with its two sites are broadly similar in terms of lithology, rock ages, and tectonic histories. The two areas differ in terms of degree of deformation, and tectonic fabric. Some lithologic and tectonic differences are noticeable between the two sites in the Forsmark area and between the two sites in the...
Innehållstyp: Publikationer
Gå till sida:
-
1 (nuvarande sida)
- Sida: 2
- Sida: 3
- Sida: 4
- Sida: 5