Din avgränsning ger 235 träffar.
-
Ansökningshandlingar (SFR)
Här listas Svensk Kärnbränslehantering AB:s (SKB) ansökan om tillstånd enligt kärntekniklagen, daterad 19 december 2014. I ansökan ingår också SKB:s miljökonsekvensbeskrivning (MKB).
Innehållstyp: Artiklar -
2014:54 Technical Note, Further Modelling Comparison of Simple Reference Biosphere Models with the LDF Modelling Approach – Main Review Phase
This Technical Note describes further use of simple reference biosphere models for SSM’s review of the Landscape Dose Factor (LDF) approach adopted by SKB in the SR‑Site safety assessment for the proposed final disposal of spent nuclear fuel at the Forsmark site. Simple biosphere models for the Forsmark site under temperate climate conditions were previously developed for SSM’s review and are...
Innehållstyp: Publikationer -
2014:58 Technical Note, Rock Mechanics - Assessing probability and extent of blind faults and fault-end growth around the KBS-3 repository at Forsmark – Main Review Phase
To get a general understanding of the stability conditions of the fault and deformation zone inventory at Forsmark a reactivation potential analysis was carried out. At present-day stress conditions the deformation zones are stable and show no large deformations or detected seismicity. Any changes in stress, and in particular increase of differential stress on deformation zones, might cause...
Innehållstyp: Publikationer -
2014:55 Technical Note, Further Reproduction of SKB’s Calculation Cases and Independent
Som en del av säkerhetsanalysen SR-Site presenterar SKB modellresultat som illustrerar kapseln och buffertens säkerhetsfunktioner. I var och en av de fem beräkningsfallen är delar av kapsel och/eller buffert frånvarande i modellen av slutförvarssystemet. Modellresultaten jämförs inte med säkerhetskriterier eftersom beräkningsfallen innehåller...
Innehållstyp: Publikationer -
2015:05 Technical Note, Review of uncertainty propagation and sensitivity analysis in SR-Site Main Review Phase
The review assignment SSM2014-2060 “Review of uncertainty and sensi- tivity analysis in SR-Site” addressed three issues: Adequacy of the methods adopted by SKB for conducting sensitivity analyses Approach for use of conservative and best-estimate parameter values Propagation of uncertainty for the corrosion scenario Adequacy of the methods for sensitivity analyses: The sensitivity analyses...
Innehållstyp: Publikationer -
2014:59 Technical Note, Relation between earthquake magnitude, fracture length and fracture shear displacement in the KBS-3 repository at Forsmark – Main Review Phase
This study addresses one of several scenarios that could impair the physical integrity of the repository of spent nuclear fuel at the Forsmark site. Two sources of threat are: i) events due to thermal loading on the rock mass by the heat from canisters with spent nuclear fuel, and ii) seismic events, i.e. earthquakes, at the nearby deformation zones and zones intersecting the repository area.
Innehållstyp: Publikationer -
2015:01 Technical Note, Rock Mechanics - Thermal properties and thermal modelling of the rock in a repository of spent nuclear fuel at Forsmark – Main Review Phase
In preparation for the review of SKB's license application for a disposal of spent nuclear fuel, SSM has conducted a series of modelling studies related to the design, construction and long-term safety of a repository at Forsmark. Several of the presented modelling works are related to the thermal evolution of the repository with time. This report extracts the results from independent SSM...
Innehållstyp: Publikationer -
Slutförvarets utveckling
Strålsäkerhetsmyndigheten och myndighetens föregångare har under flera decennnier följt projektet att ta fram en plats och metod för ett slutförvar för använt kärnbränsle. På mitten av 1970-talet inledde kärnkraftsindustrin de första geologiska studierna för att kartlägga lämpliga platser i Sverige för slutförvaring...
Innehållstyp: Artiklar -
Ansökningar, metod och platsval
Under 2011 lämnade Svensk Kärnbränslehantering AB (SKB) in sina ansökningar för en inkapslingsanläggning och en slutförvarsanläggning till Strålsäkerhetsmyndigheten för granskning. Ansökningarna är omfattande och det ingår bland annat bilagor där SKB motiverar val av metod och plats. Det finns även en redovisning om...
Innehållstyp: Artiklar -
Strålsäkerhetsmyndighetens granskning av ansökan
Svensk Kärnbränslehantering AB (SKB) lämnade in ansökningar om slutförvaring enligt kärntekniklagen till Strålsäkerhetsmyndigheten i mars 2011. Efter granskningen lämnade Strålsäkerhetsmyndigheten yttranden till regeringen i januari 2018. Myndigheten tillstyrkte ansökningarna och rekommenderade...
Innehållstyp: Artiklar