2003:09 Operational Readiness Verification, Phase 2: A Field Study at a Swedish NPP during a Productive-Outage
SKI Report 2003:09 Research Operational Readiness Verification, Phase 2: A Field Study at a Swedish NPP during a Productive-Outage Erik Hollnagel Vincent Gauthereau November 2002 ISSN 1104–1374 ... their safety reviews and have made improvements in the area of operational readiness verification based on their analyses. After these analyses and improvements of operational readiness verification SKI started...
Innehållstyp: Dokument -
2003:20e Focusing on SSI’s risk and radiation protection criteria. A report based on discussions in focus groups in Östhammar and Oskarshamn municipalities
2003:20e BRITT-MARIE DROTTZ-SJÖBERG Focusing on SSI’s risk and radiation protection criteria A report based on discussions in focus groups in Östhammar and Oskarshamn municipalities SSI rapport: ... Avd. för personal- och patientstrålskydd. TITLE/ TITEL: Focusing on SSI’s risk and radiation protection criteria. A report ba- sed on discussions in focus groups in Östhammar and Oskarshamn municipalities/...
Innehållstyp: Dokument -
2003:47 Field Test of a DCVD Using an Ixon Camera with a Lumogen-Coat EMCCD Detector (pdf 670 kB)
668 kB ... CSSP Report 2004-01-03 SKI Report ISRN SKI-R-03/47 FIELD TEST OF A DCVD USING AN IXON CAMERA WITH A LUMOGEN-COATED EMCCD DETECTOR Canadian and Swedish Safeguards ... Safeguards Support Programs CSSP Report 2004-01-03 SKI Report ISRN SKI-R-03/47 FIELD TEST OF A DCVD USING AN IXON CAMERA WITH A LUMOGEN-COATED EMCCD DETECTOR Prepared for...
Innehållstyp: Dokument -
2003:19 Nuclear Waste Separation and Transmutation Research with Special Focus on Russian Transmutation Projects Sponsored by ISTC (pdf 2 MB)
SKI Report 2003:19 Research Nuclear Waste Separation and Transmutation Research with Special Focus on Russian Transmutation Projects Sponsored by ISTC Most of Fission Products OUT Actinides, Long- lived ... spent nuclear fuel. Aim During a number of years SKI has supported a group that follows the research on nuclear waste separation and transmutation within the ISTC. The purpose is to see how far the research...
Innehållstyp: Dokument -
2003:18 Making a Historical Survey of a State's Nuclear Ambitions (pdf 467 kB)
SWE C 01333 Impact of Historical Developments of a State’s National Nuclear Non-Proliferation Policy on Additional Protocol Implementation Dr. Thomas Jonter March 2003 ISSN 1104–1374 ISRN SKI-R-03/18-SE ... Atomic Energy Agency, IAEA. The Additional Protocol gives the Agency the right of more information on the nuclear fuel cycle activities in the State. The Protocol also gives extended access to areas and...
Innehållstyp: Dokument -
2003:43 Development of an Estimating Procedure for the Annual PLAN Process - with Special Emphasis on the Estimating Group (pdf, 542 kB)
Research Development of an Estimating Procedure for the Annual PLAN Process - with Special Emphasis on the Estimating Group Steen Lichtenberg January 2003 ISSN 1104–1374 ISRN SKI-R-03/43-SE SKI Report ... Research Development of an Estimating Procedure for the Annual PLAN Process - with Special Emphasis on the Estimating Group Steen Lichtenberg Lichtenberg & Partners ApS Management Consultants 203 Strandvejen...
Innehållstyp: Dokument -
2003:35 Observations on Hydride Structures at the Tip of Arrested Cracks Grown under Conditions of Delayed Hydride Cracking
SKI Report 2003:35 Research Observations on Hydride Structures at the Tip of Arrested Cracks Grown under Conditions of Delayed Hydride Cracking Kjell Pettersson Magnus Oskarsson Hans Bergqvist April ... projekthandläggare: Jan in de Betou SKI:s projektnummer: 99135 SKI Report 2003:35 Research Observations on Hydride Structures at the Tip of Arrested Cracks Grown under Conditions of Delayed Hydride Cracking...
Innehållstyp: Dokument -
2003:36 How Agencies Inspect
SKI PERSPECTIVE Background The regulatory approach used by SKI has an impact on the licensee and, therefore, indirectly on the safety of the nuclear facilities. The regulatory policy and its implementation ... regulator as well as by the industry. One of SKI´s tasks is to be able adjust the regulatory approach to current and future needs. Little research is available on the use of regulatory strategies, methods and...
Innehållstyp: Dokument -
2003:21 (SKI 2003:37) SSI:s och SKI:s granskning av SKB:s uppdaterade Slutlig Säkerhetsrapport för SFR 1. Granskningsrapport
som SFR 1 har varit i drift har erfarenheter av att driva anläggningen gjorts och ny kunskap om SFR 1:s långtids- funktion vunnits. Nya föreskrifter för kärntekniska anläggningar har tillkommit sedan SFR ... Tillämpning av regelverk och bedömningsgrunder.......................................... 14 3 SFR 1:S KONSTRUKTION.......................................................................................
Innehållstyp: Dokument -
2003:29 Long-term Integrity of the KBS-3 Engineered Barrier System (pdf 5,1 MB)
review of future license applications, the Swedish Nuclear Power Inspectorate (SKI) organised a workshop on engineered barrier integrity of the KBS-3 concept, held 6-8 November 2002. The main topic of the workshop ... to engineered barrier integrity by external experts, and working group sessions. The latter focussed on three time scales; the fabrication and pre-closure period, the initial thermal period and the long-term...