Din avgränsning ger 145 träffar.
-
2012:16 El och kontrollutrustning i kärnkraftverk. Problematik vid utbyte av åldrad utrustning
2788 kB...
Innehållstyp: Dokument -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
1558 kB...
Innehållstyp: Dokument -
2012:46 Technical Note, Review of Landscape Models used in SR-Site
1363 kB...
Innehållstyp: Dokument -
2012:45 Beräkning av merkostnader 2012 för avveckling och rivning av de svenska kärnkraftverken och omhändertagande av restprodukter
2014 kB...
Innehållstyp: Dokument -
2012:29 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
1934 kB...
Innehållstyp: Dokument -
2012:18 Technical Note, SR-Site Independent Modelling of Engineered Barrier Evolution and Coupled THMC: Contribution to the Initial Review Phase
5043 kB...
Innehållstyp: Dokument -
2012:04 Förslag till nationell modell för klinisk revision av strålbehandlingsverksamhet
2230 kB...
Innehållstyp: Dokument -
2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper
The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...
Innehållstyp: Publikationer -
2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review
This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 1
- Sida: 2
- …
- Sida: 9
- Sida: 10
- Sida: 11
-
12 (nuvarande sida)
- Sida: 13
- Sida: 14
- Sida: 15
- Nästa sida