Visar 140 sökträffar på ”ågesta”
-
Sweden's presentation 2015.pdf
3543 ... reactors in operation (Forsmark, Ringhals, Oskarshamn) Four closed down reactors (Barsebäck, Ågesta, Studsvik) Central storage facility for spent fuel (Clab) Central repository for short-lived ... 2015 Questions to Sweden Main areas - IIII Decommissioning – plans for decommissioning of Ågesta – objectives of SKB’s NPP decommissioning studies – requirements on updating of decommissioning...
Innehållstyp: Dokument -
Spent fuel report.pdf
reference scenario presented in Section 2.1.1. There was a pressurised heavy water reactor (PHRW) in Ågesta in operation during 1963–1974. The reactor supplied a suburb in Stockholm with district heating ... the minor quantities of miscellaneous spent fuel to be deposited can be summarised as follows. • Ågesta PHWR fuel The majority of the fuel assemblies (about 70%) contain natural uranium and the remainder...
Innehållstyp: Dokument -
2009:29e Swedish national plan for the management of all radioactive waste
1454 ... 82 kg Method not determined SFK – Uranium, recycled (REPU) – 9 tonnes Packaged SFL – From Ågesta Plutonium – 3.3 kg Method not determined – Demolition waste Short-lived LILW-SL – 5,000 ... waste from old nuclear facilities (e.g. Ågesta district-heating nuclear plant and research reactor R1) has not been reported separately. The decommissioning of Ågesta is not included in SKB’s plans, but...
Innehållstyp: Dokument -
2009:29 Nationell plan för allt radioaktivt avfall
– 82 kg Metod är inte fastställd SFK – Uran, återcyklat (REPU) – 9 ton Förpackas SFL – Från Ågesta Plutonium – 3,3 kg Metod är inte fastställd – Rivningsavfall Kortlivat LILW-SL – 5000 ... rivningsavfall från gamla kärntekniska anläggningar (t.ex. Ågesta kärnkraftvärmeverk och forskningsreaktorn R1) har inte redovisats separat. Avvecklingen av Ågesta ingår inte i SKB:s plane- ring utan sköts tills...
Innehållstyp: Dokument -
Årsredovisning 2014
SFR i Forsmark. Vidare ingår de fem reaktorer som är under avveckling vid Barsebäck, Studsvik och Ågesta, avvecklingsplaneringen vid kärntekniska anläggningar i drift samt planerad inkapslingsanläggning ... perioden 2016–17. Huvudfasen av rivningen är planerad att påbörjas 2020. Nedmontering och rivning av Ågesta kraftvärmeverk, som är i servicedrift sedan 1974, är planerad att påbörjas 2020. 0 0,1 0,2...
Innehållstyp: Dokument -
Årsredovisning 2015
SFR i Forsmark. Vidare ingår de fem reaktorer som är under avveckling vid Barsebäck, Studsvik och Ågesta, avvecklingsplaneringen vid kärntekniska anläggningar i drift samt planerad inkapslingsanläggning ... pågå fram till 2019. Under året har också Vattenfall beslutat om projektstart för avvecklingen av Ågesta kraftvärmeverk, med start av nedmontering och rivning senast 2020. Svafo planerar en ny lagerbyggnad...
Innehållstyp: Dokument -
2007:19 An Applied Study of Implementation of the Advanced Decommissioning Costing Methodology for Intermediate Storage Facility for Spent Fuel in Studsvik
regarding estimated dismantling costs of nuclear installations located at the Studsvik site and Ågesta. Project information At SKI Staffan Lindskog has been responsible for supervising and co-ordinating ... PREPARED BY SVAFO The AB SVAFO company is responsible for future decommissioning of nuclear facilities Ågesta and Ranstad at Studsvik,. The SVAFO company elaborated a study on decommissioning cost estimates...
Innehållstyp: Dokument -
2016:38 Kartläggning av värdefull natur kring Sveriges kärntekniska anläggningar
............................................................................................ 76 Ågesta ................................................................................................ ... småskaliga odlingslandskap. Sju av åtta anlägg- ningar ligger i anslutning till vatten, varav Forsmark, Ågesta, Studsvik och Oskarshamn utmed Östersjökustens sprickdalsskärgårdar, Barsebäck invid den flacka...
Innehållstyp: Dokument -
PSU Toppdokument KTL.pdf
kärnkraftverken – och motsvarande avfall från annan kärnteknisk verksamhet i Sverige, till exempel Clab, Ågesta och i Studsvik – medför ökat behov av slutförvaring av sådant avfall. Som nämnts tidigare sker slutförvaring ... med mera från rivning av kärnkraftverken och andra kärntekniska anläggningar, till exempel Clab, Ågesta och anläggningar i Studsvik. Till det kortlivade låg- och medelaktiva rivningsavfallet hör också...
Innehållstyp: Dokument -
00:56 The Application of State-Level Integration of Safeguards in Sweden. Final Report
reactor (MTR) using MTR fuel as well as several small research reactors were started. In Stockholm the Ågesta pressurised heavy water reactor (HWR) for heat and electricity production was taken into operation ... uranium had decreased to the extent that mining in Ranstad was of no commercial interest. In 1974 the Ågesta reactor was closed down because the safety systems had to be up-graded and this was considered too...
Innehållstyp: Dokument