Din avgränsning ger 10 träffar.
-
2016:23 Technical Note, Modelling of the thermal evolution of the KBS-3 repository at Forsmark and associated induced seismic activity
Main Review Phase Introduction The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) ... repository at Forsmark – Main Review Phase” (Yoon et al., 2014). Jeoung Seok Yoon, Ove Stephansson, Ki-Bok Min SSM English Main Review Phase Introduction The Swedish Radiation Safety Authority (SSM) reviews the...
Innehållstyp: Publikationer -
2016:15 Recent Research on EMF and Health Risk, Eleventh report from SSM’s Scientific Council on Electromagnetic Fields, 2016
subjects were exposed for 50 min while they were in a static condition, i.e. lying still in the MRI scan- ner. This was followed by a 20 min break and then a second 50 min run followed in which the table ... distance to the scalp was 20 mm) for 20 min. Effects on the intracortical inhibitory system were measured by transcranial magnetic stimulation (TMS) 0, 10 and 30 min after exposure. Results were compared...
Innehållstyp: Dokument -
2016:02 Technical Note, An updated review of the creep ductility of copper including the effect of phosphorus
1389 kB ... years 100 160 years 3950 years 150 102 days 7 years 200 17 hours 18 days 250 18 min 7,6 hours 300 39 sec 16 min 350 2,4 sec 59 sec 400 0,2 sec 5,4 sec The values show that it is indeed correct...
Innehållstyp: Dokument -
2016:10 Utredning om funktions- och leveranskontroller av radiologisk utrustning
1783 kB ... genomlysningsuret Leverans, årligen Subjektiv bedömning vid felaktighet. Utebliven signal efter 5 min. [2] Överrensstämmelse mellan indikerad och verklig rörspänning Leverans, årligen ± ... Kompressionsplattans kanter syns Max kompression <150 N eller >200 N Ej oförändrad kraft under 1 min >20 N avvikelse från visat värde [2, 13]...
Innehållstyp: Dokument -
2016:30 Measurement of Parameter Values for Predicting Corrosion Phenomena on Copper in Swedish HLNW Repositories
the experiment itself. The WE was initially reduced potentiostatically at -1.2 V vs. SCE for 20 min to remove any air-formed oxide on the surface. A two-hour rest at the open circuit potential (OCP) ... during all the experiments. The WE was initially reduced potentiostatically at -1.2 V vs. SCE for 5-min to remove any air-formed oxide on the surface of the electrode. A two-hour test of the open circuit...
Innehållstyp: Dokument -
2016:27 Validation of fatigue fracture mechanics approaches
Amplitude ∎init Quantity related to fatigue crack initiation (position) ∎max, max∎ Maximum value ∎min Minimum value ∎nom Nominal value ∎th Threshold value ∎ Quantity related to logarithmic variable ... owth law factors Standar 2.05 10- -estimate app nted in Tabl n stipulated in h in air in au min / Kmax. Th In the curre redominant r actor in Tabl maller const ork performe oom tempera steel pipe...
Innehållstyp: Dokument -
2016:12 SSM’s external experts’ reviews of SKB’s safety assessment SR-PSU – engineered barriers, engineering geology and chemical inventory
3808 kB ... engineering and engineering geology issues related to the safety of the extension of SFR. Ki-Bok Min and Ove Stephansson. 4) Review of the inventory of chemical substances in the waste and waste packaging...
Innehållstyp: Dokument -
2016:23 Technical Note, Modelling of the thermal evolution of the KBS-3 repository at Forsmark and associated induced seismic activity
8859 kB ... induced seismic activity Main Review Phase 2016:23 Authors: Jeoung Seok Yoon Ove Stephansson Ki-Bok Min SSM 2016:23 SSM 2016:23 SSM perspektiv Bakgrund Strålsäkerhetsmyndigheten (SSM) granskar Svensk...
Innehållstyp: Dokument -
2016:08 SSM’s external experts’ reviews of SKB’s safety assessment SR-PSU – hydrogeological and chemical aspects
3289 kB ... early stages (for example relating to tunnel wall exposures and drainage engineering). Finally, a min...
Innehållstyp: Dokument -
2016:14 Radiological examinations of children: a study of method options
1328 kB ... percentage of assessed justification is shown by region (Figures 11, 12). Waiting time Days Min 0 Max (e.g. planned checkups) 767 Average 23 Median 4 SSM 2016:14 38 Figure 11. The reviewers’...
Innehållstyp: Dokument
Gå till sida:
-
1 (nuvarande sida)