Sök

Din avgränsning ger 272 träffar.

Sortera på:

Relevans Datum
  • 2014:48 Technical Note, Independent assessment of groundwater sulphide content in the long-te

    Groundwater sulphide content is a key factor in the determination of canister lifetimes because of its role in corrosion of copper. SKB has based the canister lifetime analysis on a distribution of measured sulphide concentrations which are assumed to apply throughout the long-term analysis period. The distribution is based on expert judgement in the selection of samples that are regarded as...

    Innehållstyp: Publikationer
  • Ansökan enligt kärntekniklagen

    Här hittar du Svensk Kärnbränslehantering AB:s (SKB) ansökan om tillstånd enligt kärntekniklagen att få bygga ut slutförvaret för kortlivat radioaktivt avfall (SFR), daterad 19 december 2014, samt inkomna kompletteringar till ansökan.

    Innehållstyp: Artiklar
  • 2014:50 Technical Note, A Study of Availability of Fuel Data for Sweden’s Spent Nuclear Fuel

    The study covers all types spent fuel planned to be placed in the final repository. It was carried out by selecting a sample of spent fuel and investigating the information available at the Nuclear Power Plants (NPP’s) in Sweden, the Central interim storage facility (Clab) and Studsvik. The results indicate that the required data is available and can be obtained for fuel unloaded after 1980.

    Innehållstyp: Publikationer
  • 2017:17 Granskning och utvärdering av SKB:s redovisning av Fud-program 2016

    Strålsäkerhetsmyndighetens yttrande Svensk Kärnbränslehantering AB (SKB) har lämnat in Fud-program 2016 till Strålsäkerhetsmyndigheten (SSM) för granskning och utvärdering enligt 12 § lagen 1984:3) om kärnteknisk verksamhet kärntekniklagen). SSM föreslår att regeringen beslutar att reaktorinnehavarna genom SKB:s redovisning...

    Innehållstyp: Publikationer
  • 2010:25 Modelling Coupled Processes in the Evolution of Repository Engineered Barrier Systems using QPAC-EBS

    Currently in Sweden, the SR-Site safety assessment for a spent nuclear fuel repository is being developed by the Swedish Nuclear Fuel and Waste Management Company (SKB). The planned SSM review of this work requires access to a sufficient modelling capability to assess the combined performance of the engineered barriers (spent fuel canister, buffer and backfill) and the natural geosphere...

    Innehållstyp: Publikationer
  • 2010:24 On Cost Estimate for Decommissioning of one Isotope Central

    The present generation has the responsibility to ensure and guarantee that sufficient financial resources are accrued into the Swedish Nuclear Waste Fund to cover all future costs. Thus, the next generation, as well as any succeeding generations, will have the financial resources required in order to undertake the necessary measures, in an appropriate manner, for the decommissioning and...

    Innehållstyp: Publikationer
  • 2010:33 Lineament interpretation Short review and methodology

    This report concerns a study which was initially conducted for the Swedish Nuclear Power Inspectorate (SKI), which is now merged into the Swedish Radiation Safety Authority (SSM). The conclusions and viewpoints presented in the report are those of the author and do not necessarily coincide with those of the SSM. In the characterization of a site that may have potential for hosting a...

    Innehållstyp: Publikationer
  • 2010:28 GEMA3D – landscape modelling for dose assessments

    Post-closure safety assessments for nuclear waste repositories involve radioecological modelling for an underground source term. Following several decades of research and development, the Swedish Nuclear Waste Management Company (SKB) is approaching a phase of license application. According to SKB’s plans, an application to construct a geological repository will be submitted by the end of...

    Innehållstyp: Publikationer
  • 2010:31 Buffer erosion: An overview of concepts and potential safety consequences

    In its safety analysis SR-Can, SKB reported preliminary results and conclusions on the mechanisms of bentonite colloid formation and stability, with a rough estimate of the consequences of loss of bentonite buffer by erosion. With the review of SR-Can the authorities (SKI and SSI) commented that erosion of the buffer had the greatest safety significance, that the understanding of the...

    Innehållstyp: Publikationer
  • 2010:30 INSITE Summary Report

    SSM and its predecessor SKI employed a team of earth scientists who followed and reviewed SKB’s investigations of the potential spent nuclear fuel repository sites at Forsmark and Laxemar. This group was named INSITE (INdependent Site Investigation Tracking and Evaluation) and began its work in 2002 and completed its task with the review of the final versions SKB’s site descriptive models,...

    Innehållstyp: Publikationer