Din avgränsning ger 272 träffar.
-
2015:08 Technical Note, Rheological properties of the Bentonite Buffer
Objectives of the project The general objective of the project is to provide review comments on SKB’s postclosure safety analysis, SR-Site, for the proposed repository at Forsmark. This technical note reviews SKB:s reporting of the rheological and geomechanical properties of buffer bentonite, both at high and low densities. Göran Sällfors, GeoForce AB, Göteborg SSM English Objectives of...
Innehållstyp: Publikationer -
2016:02 Technical Note, An updated review of the creep ductility of copper including the effect of phosphorus
Background The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a reposi-tory for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific...
Innehållstyp: Publikationer -
2016:23 Technical Note, Modelling of the thermal evolution of the KBS-3 repository at Forsmark and associated induced seismic activity
Main Review Phase Introduction The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of the KBS-3 repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain...
Innehållstyp: Publikationer -
2016:05 Technical Note, Assessment of SKB TR-14-15 Assessment of SKB TR-14-15 “Possible influence from stray currents from high voltage DC power transmission on copper canisters”
The general objective of the present project is to provide independent review comments for one area of SKB:s post closure safety analysis, SR-Site. With this in mind, the purpose of this report is to review SKB’s presentation on possible influence from stray currents from high voltage DC power transmission on a repository for nuclear fuel. Laust B Pedersen SSM English The general objective of...
Innehållstyp: Publikationer -
2014:38 Technical Note, Detailed assessment of radionuclide Kd-values for the geosphere-main review phase
The Swedish Radiation Safety Authority (SSM) is reviewing an application submitted by the Swedish Nuclear Fuel and Waste Management Company (SKB) in 2011 to construct and operate a deep geologic repository for spent nuclear fuel at the Forsmark site in the municipality of Östhammar, Sweden. SKB has presented details of its long-term safety assessment, SR-Site, in a main report (SKB, 2011,...
Innehållstyp: Publikationer -
2014:33 Technical Note, Reproduction of SKB’s Canister Failure Calculations - What-If and ‘Residual’ Scenario to Illustrate Barrier Functions
The Swedish Nuclear Fuel and Waste Management Company (SKB) included analysis of a range of scenarios in its SR-Site report. SKB grouped these scenarios into two categories—main and residual. The main scenario included a likely scenario (corrosion failure) and a less probable scenario (seismicity-induced shear failure). The residual scenario included two unlikely scenarios—isostatic-load and...
Innehållstyp: Publikationer -
2014:23 Technical Note, Workshop on Rock Mechanics Issues and their Implications for Groundwater Flow – Main Review Phase
This report describes the outcome of the workshop organized by SSM on Rock Mechanics and Hydrogeology that was held in Stockholm on the 30/9 and 1/10, 2013. The report summarizes the issues discussed and extracts the essential viewpoints that have been expressed. It should not be considered as a comprehensive record of all the discussions at the workshop and individual statements made by...
Innehållstyp: Publikationer -
2014:41 Technical Note, Review of Radionuclide Abstraction and Selection in the SKB Safety Case -Main Review Phase
As part of the Swedish Radiation Safety Authority (SSM) review of the Swedish Nuclear Fuel and Waste Management Company (SKB) SR-Site safety assessment for a spent nuclear fuel repository in Sweden, this technical note documents the Center for Nuclear Waste Regulatory Analyses (CNWRA®) review of the abstraction and selection of radionuclides in the SKB safety case. Specifically, CNWRA...
Innehållstyp: Publikationer -
2008:10 User’s manual for Ecolego Toolbox and the Discretization Block
The CLIMB modelling team (Catchment LInked Models of radiological effects in the Biosphere) was instituted in 2004 to provide SSI with an independent modelling capability when reviewing SKB’s assessment of long-term safety for a geological repository. Modelling in CLIMB covers all aspects of performance assessment (PA) from near-field releases to radiological consequences in the surface...
Innehållstyp: Publikationer -
2008:09 The Generalised Ecosystem Modelling Approach in radiological assessment
An independent modelling capability is required by SSI in order to evaluate dose assessments carried out in Sweden by, amongst others, SKB. The main focus is the evaluation of the long-term radiological safety of radioactive waste repositories for both spent fuel and low-level radioactive waste. To meet the requirement for an independent modelling tool for use in biosphere dose assessments,...
Innehållstyp: Publikationer