2014:59 Technical Note, Relation between earthquake magnitude, fracture length and fracture shear displacement in the KBS-3 repository at Forsmark – Main Review Phase
This study addresses one of several scenarios that could impair the physical integrity of the repository of spent nuclear fuel at the Forsmark site. Two sources of threat are: i) events due to thermal loading on the rock mass by the heat from canisters with spent nuclear fuel, and ii) seismic events, i.e. earthquakes, at the nearby deformation zones and zones intersecting the repository area.
Innehållstyp: Publikationer -
2015:01 Technical Note, Rock Mechanics - Thermal properties and thermal modelling of the rock in a repository of spent nuclear fuel at Forsmark – Main Review Phase
In preparation for the review of SKB's license application for a disposal of spent nuclear fuel, SSM has conducted a series of modelling studies related to the design, construction and long-term safety of a repository at Forsmark. Several of the presented modelling works are related to the thermal evolution of the repository with time. This report extracts the results from independent SSM...
Innehållstyp: Publikationer -
2014:24 Technical Note, Workshop on biosphere issues
The objective of this workshop was to bring together experts in the field of radionuclide transport in the biosphere including non-human biota and dose assessment to discuss the findings of the detailed reviews performed during the main review phase and to identify any further biosphere review issues. This report describes the outcome of the workshop organized by SSM on Biosphere Issues that...
Innehållstyp: Publikationer -
2014:11 Technical Note, Radionuclide Solubility Limits in SKB’s Safety Case
The Swedish Radiation Safety Authority (SSM) is reviewing a license application, which has been submitted by Svensk Kärnbränslehantering AB (SKB), for a spent nuclear fuel repository at Forsmark. This technical note records the findings from a project that forms part of the main phase of SSM’s license application review. The project involved review of reports and independent modelling...
Innehållstyp: Publikationer -
2014:10 Technical Note, Rock Mechanics - Confidence of SKB’s models for predicting the occurrence of spalling – Main Review Phase
This review study is placed in the context of SSM’s Main Review Phase for SKB’s safety assessment SR-Site. The assignment is titled “Rock Mechanics – Confidence of SKB’s models for predicting the occurrence of spalling”. The report presents the authors’ assessment in response to the questions raised by SSM. The review concentrated on two main issues: (1) the analysis of the assumptions made...
Innehållstyp: Publikationer -
2014:08 Technical Note, Review of Long-Term Redox Evolution of Groundwater and Potential Influence of Oxygenated Glacial Meltwater in SR-Site
The Swedish Radiation Safety Authority (SSM) is reviewing an application submitted by the Swedish Nuclear Fuel and Waste Management Company (SKB) in 2011 to construct, possess, and operate a deep geologic repository for spent nuclear fuel at the Forsmark site in the municipality of Östhammar, Sweden. SKB has presented details of its long-term safety assessment, SR-Site, in a main report...
Innehållstyp: Publikationer -
2013:37 Technical Note, Rock Mechanics – Evolution of fracture transmissivity within different scenarios in SR-Site – Main Review Phase
The current review assignment consists of a literature review and independent modeling for assessing the importance of fracture transmissivity change especially driven by shear loading due to SKB’s thermal, glacial and earthquake loading scenarios for the KBS-3 repository at Forsmark. In the first part of the report, SKB’s laboratory experiments on shear fracture dilation and extensive...
Innehållstyp: Publikationer -
2013:34 Technical Note, Seismology – Post-glacial seismicity and paleoseismology at Forsmark
Metoden som SKB använder för att förutse seismisk risk för slutförvaret skiljer sig i två avseenden från gängse förfarande. För det första, förkastningsrörelser inom förvaret är beräknade utifrån numeriska bergmekaniska modeller i stället för genom en Probabilistisk riskanalys för förkastningsrörelse...
Innehållstyp: Publikationer -
2013:26 Degradering av berg, förstärkningar och injektering i tunnlar
Befintliga och planerade slutförvarsanläggningar för radioaktivt avfall kräver särskilda kunskaper för dess projektering och för att följa upp dess utveckling under drift samt efter förslutning. Kunskaper behövs för att välja anläggningens utformning, passande material, underhåll samt förslutningsmetoder. De långa...
Innehållstyp: Publikationer -
2012:63 Technical Note, Review of Radionuclide Sorption on Bentonite and Forsmark Bedrock Material
Denna rapport granskar sorption-data för bentonit och berg vilka har använts i säkerhetsanalysen SR-Site. Det kan konstateras att härledningen av Kd-värden har gjorts på ett systematiskt sätt och att presentationen av resultat är uttömmande. Kontroller visar att härledning och överföring av resultat kan betraktas som spårbar. Det...
Innehållstyp: Publikationer