2012:46 Technical Note, Review of Landscape Models used in SR-Site
As part of SSM’s Initial Review phase of SKB’s SR-Site safety assessment for the proposed final disposal of spent nuclear fuel at the Forsmark site, Quintessa was given the assignment to consider whether the landscape models and supporting data utilised by SKB are appropriate and fit for purpose. This Technical Note summarises the findings of Quintessa’s review. SKB’s approach to the...
Innehållstyp: Publikationer -
2012:42 Technical Note, Initial review of physical properties and processes of the buffer and backfill – Installation and initial state
The technical note briefly summarises the proposed designs and functions of the buffer and backfill, and examines SKB’s progress in manufacturing, installing and testing its proposed solutions. In brief, the review suggests that there are some procedural and practical engineering aspects (e.g., quality assurance procedures, backfilling rates) and several physical processes to do with the...
Innehållstyp: Publikationer -
2012:29 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
De dokument i SR-Site som är relevanta till detta granskningsområde bedöms vara generellt i tillräckligt hög kvalitet för att utgöra underlagsmaterial för vidare granskning i huvudgranskningsfasen av SSM:s GLS- (granskning av långsiktig säkerhet) projekt. Behov av kompletterande information eller förtydliganden har dock identifierats inom...
Innehållstyp: Publikationer -
2012:26 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill - Chemical erosion processes
The SR-Site documentation relevant to this review topic was found to be of sufficiently high quality overall to justify further consideration in the Main Review Phase of SSM’s PCS (Post-closure safety) project. Several specific topics for which complementary information and clarifications should be requested from SKB were also identified (Appendix 2). Specific review topics for consideration...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer -
2012:13 Technical Note, A review of the creep ductility of copper for nuclear waste canister application
SKB has presented insufficient evidence to justify their position that the OFP copper has an adequate creep ductility during long term storage. Their large body of experiments only serves to prove that the creep ductility is sufficient for much shorter time spans than the intended storage times. There is a clear need for a credible theory of creep brittleness of OFP copper which will permit...
Innehållstyp: Publikationer -
2012:06 Decommissioning Cost Assessment
The future costs for dismantling, decommissioning and handling of associated radioactive waste of nuclear installations represents substantial liabilities. It is the generations that benefits from the use of nuclear installations that shall carry the financial burden. Nuclear waste programmes have occasionally encountered set-backs related to the trust from society. This has resulted in...
Innehållstyp: Publikationer -
2012:10 Technical Note, Review of the Geomicrobiological Aspects of SKB’s Licence Application for a Spent Nuclear Fuel Repository in Forsmark, Sweden
The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...
Innehållstyp: Publikationer -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Innehållstyp: Publikationer -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
This technical note is part of a set of reviews for Swedish Radiation Safety Authority (SSM) by external experts to assist with the Initial Review Phase. The overall goal of the Initial Review Phase is for SSM to achieve a broad coverage of the information provided in SR-Site and its supporting references and in particular to identify where complementary information or clarifications need to...