Din avgränsning ger 51 träffar.
-
2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper
The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer -
2012:24 Technical Note, Initial Review of SR-Site Main Report
The Swedish Radiation Safety Authority (SSM) is reviewing a license application, which has been submitted by Svensk Kärnbränslehantering AB (SKB), for a repository for the final disposal of spent nuclear fuel. SKB’s Application includes an assessment of the long-term safety of the proposed repository. The assessment is known as SR-Site. This technical note records the findings from a...
Innehållstyp: Publikationer -
2012:13 Technical Note, A review of the creep ductility of copper for nuclear waste canister application
SKB has presented insufficient evidence to justify their position that the OFP copper has an adequate creep ductility during long term storage. Their large body of experiments only serves to prove that the creep ductility is sufficient for much shorter time spans than the intended storage times. There is a clear need for a credible theory of creep brittleness of OFP copper which will permit...
Innehållstyp: Publikationer -
2012:06 Decommissioning Cost Assessment
The future costs for dismantling, decommissioning and handling of associated radioactive waste of nuclear installations represents substantial liabilities. It is the generations that benefits from the use of nuclear installations that shall carry the financial burden. Nuclear waste programmes have occasionally encountered set-backs related to the trust from society. This has resulted in...
Innehållstyp: Publikationer -
2012:10 Technical Note, Review of the Geomicrobiological Aspects of SKB’s Licence Application for a Spent Nuclear Fuel Repository in Forsmark, Sweden
The Swedish Radiation Safety Authority (SSM) reviews the Swedish Nuclear Fuel Company’s (SKB) applications under the Act on Nuclear Activities (SFS 1984:3) for the construction and operation of a repository for spent nuclear fuel and for an encapsulation facility. As part of the review, SSM commissions consultants to carry out work in order to obtain information on specific issues. The...
Innehållstyp: Publikationer -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Innehållstyp: Publikationer -
2012:57 Technical Note, Shear movement of near-field rock due to large earthquakes
This technical note is part of a set of reviews for Swedish Radiation Safety Authority (SSM) by external experts to assist with the Initial Review Phase. The overall goal of the Initial Review Phase is for SSM to achieve a broad coverage of the information provided in SR-Site and its supporting references and in particular to identify where complementary information or clarifications need to...
Innehållstyp: Publikationer -
2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Innehållstyp: Publikationer -
2012:61 Geochemical Constraints on Buffer Pore Water Evolution and Implications for Erosion
Mineralogical data from the Forsmark Site show that smectite and calcite occur at all depths in Forsmark fractures, with no evidence for removal/dissolution by previous glacial episodes. This natural analogue information implies that these minerals may not have been eroded/dissolved during previous glacial episodes. Available thermodynamic data suggest that repository-depth Forsmark...
Innehållstyp: Publikationer